08.01.2013 Views

Steel Designers Manual - TheBestFriend.org

Steel Designers Manual - TheBestFriend.org

Steel Designers Manual - TheBestFriend.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This material is copyright - all rights reserved. Reproduced under licence from The <strong>Steel</strong> Construction Institute on 12/2/2007<br />

To buy a hardcopy version of this document call 01344 872775 or go to http://shop.steelbiz.<strong>org</strong>/<br />

<strong>Steel</strong> <strong>Designers</strong>' <strong>Manual</strong> - 6th Edition (2003)<br />

1002 Erection<br />

clench and<br />

unclench<br />

fingers to<br />

signal take<br />

the strain<br />

signal with one hand<br />

other hand on head<br />

JIB UP JIB DOWN<br />

DERRICKING JIB<br />

clench and<br />

unclench<br />

fingers to<br />

signal inch<br />

the load<br />

signal with both hands<br />

TRAVEL TO ME<br />

TRAVEL FROM ME<br />

HOIST LOWER SLEW LEFT SLEW RIGHT<br />

EXTEND JIB RETRACT JIB<br />

TELESCOPING JIB<br />

TROLLEY OUT TROLLEY IN<br />

HORIZONTAL JIB<br />

Fig. 33.18 Standard hand signals for lifting<br />

STOP EMERGENCY<br />

STOP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!