08.01.2013 Views

Steel Designers Manual - TheBestFriend.org

Steel Designers Manual - TheBestFriend.org

Steel Designers Manual - TheBestFriend.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This material is copyright - all rights reserved. Reproduced under licence from The <strong>Steel</strong> Construction Institute on 12/2/2007<br />

To buy a hardcopy version of this document call 01344 872775 or go to http://shop.steelbiz.<strong>org</strong>/<br />

<strong>Steel</strong> <strong>Designers</strong>' <strong>Manual</strong> - 6th Edition (2003)<br />

materials delivered to site should be stored and stacked carefully in designated<br />

areas to ensure that damage to those materials does not occur.<br />

Within the method statement, an approved testing and inspection plan will<br />

have been agreed to ensure that the as-built frame conforms to specification and<br />

design intention. BS DD ENV 1090–1 10 Execution of steel structures, General rules<br />

for buildings defines the plan fully. However, as a guide, the following should be<br />

monitored:<br />

(1) The building position is in accordance with the tolerances laid down.<br />

(2) The methods of construction have allowed for process quality control, and the<br />

tracing of components from supply source to completion.<br />

(3) The construction has not deviated from the design requirements or<br />

specification, without all changes being approved by the appropriate body,<br />

and a full record kept of those changes.<br />

In the case of the alignment of the structure, the dimensional survey should include<br />

the location, zone or area tested. This should include the tolerance the survey has<br />

been carried out to. Survey results should be transposed onto a drawing, noting the<br />

location surveyed, and any deviations from line and level. Any out-of-tolerance<br />

areas should be highlighted and a non-conformance report (NCR) instigated to<br />

enable the design engineer to approve or reject the change.<br />

Bolting or welding should be carried out to plan to enable ease of monitoring and<br />

signing off. In multi-bolt connections, as the bolt is tightened, it should be marked<br />

to ensure all bolts are adequately secured. It is often a good idea to require<br />

the operative who has tightened complex connections to initial each connection,<br />

and for management to record those connections. A drawing showing progress and<br />

areas completed should be kept and handed over to the customer as and when<br />

appropriate.<br />

33.7.2 Non-conformance procedures<br />

Quality control 987<br />

During the construction of a building, modifications to the existing structure or<br />

repairs to the new members may be necessary. All variations after the work has<br />

started must be accompanied by an NCR, traceable throughout the entire process<br />

and signed off by the design engineer.<br />

• Any damage or discrepancy should be reported using the NCR system and<br />

repaired or replaced following this approved system.<br />

On completion of the project a register with a copy of all NCRs should be given<br />

to the customer. This should include site location drawings, sections, sketches, test<br />

certificates, etc., to help complete the building’s log and ensure that all parties are<br />

aware of the changes made. A typical NCR form is shown in Fig. 33.7.