08.01.2013 Views

Steel Designers Manual - TheBestFriend.org

Steel Designers Manual - TheBestFriend.org

Steel Designers Manual - TheBestFriend.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This material is copyright - all rights reserved. Reproduced under licence from The <strong>Steel</strong> Construction Institute on 12/2/2007<br />

To buy a hardcopy version of this document call 01344 872775 or go to http://shop.steelbiz.<strong>org</strong>/<br />

<strong>Steel</strong> <strong>Designers</strong>' <strong>Manual</strong> - 6th Edition (2003)<br />

994 Erection<br />

12 500 kg<br />

L I 35.0 m<br />

III V VI X<br />

L5=55.Om<br />

III IV V X<br />

/\A/\/\J\/\\/\V\7\J\/'\<br />

L450.Om<br />

3600 kg<br />

V X<br />

/\J\/\/\/\/\J/\/\/\/\(\<br />

L345.Om<br />

III IVX<br />

/\/V\/\/\/W\/<br />

L2.40.Om<br />

III X<br />

/\A/\/V'\<br />

Fig. 33.11 Tower crane (courtesy of Delta Tower Cranes)<br />

Cranes for the stockyard<br />

6300 kg<br />

300 kg<br />

4 400 kg<br />

2900 kg<br />

Stockyard cranes have to work hard. The tonnage per job has to be handled twice<br />

in the same period of time, often with many fewer cranes. It is therefore important<br />

that cranes be selected and cited carefully to ensure maximum efficiency.<br />

33.8.3 Other solutions<br />

If there is no suitable crane, or if there is no working place around or inside the<br />

building where a crane may be placed, then consideration must be given to a special<br />

mounting device for a standard crane, or even a special lifting device to do the work<br />

of a crane, designed to be supported on the growing structure under construction.<br />

In either event, close collaboration between the designer and erector members of