23.11.2012 Views

Laws, Rules and Regulations - The National Board of Boiler and ...

Laws, Rules and Regulations - The National Board of Boiler and ...

Laws, Rules and Regulations - The National Board of Boiler and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

143<br />

CertIFICate OF InSpeCtIOn<br />

Certificate <strong>of</strong> Operation, valid for a period not longer than the interval required for certificate inspection, is issued by the department<br />

upon payment <strong>of</strong> a fee not exceeding the sum <strong>of</strong> $140.00. Fee is included in the inspection fee when boiler is inspected by<br />

deputy inspector <strong>of</strong> the jurisdiction.<br />

State FeeS<br />

1. All boilers other than heating boilers ........................................................................................................................................$140.00<br />

2. Heating boilers without manholes .............................................................................................................................................$110.00<br />

3. Heating boilers with manholes ....................................................................................................................................................$140.00<br />

4. Special inspection: fee for a special inspection is $1,200.00 . A prepayment <strong>of</strong> $1,200.00 shall be received by the<br />

department before the department can initiate the requested special inspection.<br />

mISCellaneOUS<br />

1. Repairs <strong>and</strong> alterations may be performed by the following, provided intended work is within the scope <strong>of</strong> issued Certificate<br />

<strong>of</strong> Authorization:<br />

a. Holders <strong>of</strong> a Certificate <strong>of</strong> Authorization from the <strong>National</strong> <strong>Board</strong> for use <strong>of</strong> “R” repair symbol stamp; or<br />

b. Owner/operators <strong>of</strong> boilers issued a Certificate <strong>of</strong> Authorization by the Texas Department <strong>of</strong> Licensing <strong>and</strong> Regulation:<br />

i. Issuance <strong>of</strong> Certificate <strong>of</strong> Authorization will be made upon submission <strong>of</strong> an application on forms provided by<br />

department;<br />

ii. Review <strong>of</strong> applicant’s program <strong>and</strong> facilities initially <strong>and</strong> at subsequent three-year intervals will be done.<br />

• Review will determine applicant has a documented program to control repairs <strong>and</strong>/or alterations conforming<br />

to minimum requirements established by the department;<br />

• Review will require demonstration <strong>of</strong> applicant’s ability to perform repairs <strong>and</strong>/or alterations by implementing<br />

— on representative work — the requirements <strong>of</strong> the written program.<br />

2. All safety <strong>and</strong> safety relief valves for boilers must be repaired, tested, set, <strong>and</strong> sealed by one <strong>of</strong> the following, provided<br />

scope <strong>of</strong> issued Certificate <strong>of</strong> Authorization covers work to be performed:<br />

a. An organization holding a valid V, HV, or UV Certificate <strong>of</strong> Authorization, as appropriate, issued by ASME;<br />

b. An organization holding a valid VR Certificate <strong>of</strong> Authorization issued by the <strong>National</strong> <strong>Board</strong>;<br />

c. An organization holding a valid owner/user Certificate <strong>of</strong> Authorization issued by the department. Such authorization<br />

may be granted or withheld by the executive director.<br />

3. Once a Texas commission application is approved by TDLR examinations may be scheduled thru Psychological Services<br />

Inc. (PSI). Exams are <strong>of</strong>fered at locations throughout Texas <strong>and</strong> the fee is $55.00. For more information go to http://<br />

www.license.state.tx.us/boilers/blrexam.htm.<br />

4. Texas commissions may be issued on a reciprocal basis to authorized inspectors holding <strong>National</strong> <strong>Board</strong> Commissions<br />

<strong>and</strong> who perform ASME new construction inspections only. Application shall be made on forms furnished by the chief<br />

inspector <strong>and</strong> accompanied by a photostatic copy <strong>of</strong> the applicant’s <strong>National</strong> <strong>Board</strong> Commission, current renewal card, <strong>and</strong><br />

the $25.00 fee.<br />

5. <strong>The</strong> Texas commission examination is m<strong>and</strong>atory for:<br />

a. New issuance: inspectors applying for initial issuance who are designated by the employing authorized inspection<br />

agency to perform inservice or a combination <strong>of</strong> inservice or ASME Code new construction inspections;<br />

b. Reinstatement: inspectors seeking reinstatement with time lapse <strong>of</strong> 12 months or more without any type <strong>of</strong> inspection<br />

activity <strong>and</strong> who are designated by the employing authorized inspection agency to perform inservice or a<br />

combination <strong>of</strong> inservice or ASME Code new construction inspections.<br />

For new issuances <strong>and</strong> reinstatements for inservice inspectors, inspector must attend a m<strong>and</strong>atory orientation training.<br />

6. Renewal <strong>of</strong> commissions is required annually during the month <strong>of</strong> December. Renewal fee is $10.00. Late renewal: 90<br />

days or less, $15.00; more than 90 days, $20.00. A person paying a late renewal fee is not required to pay the normal<br />

required renewal fee.<br />

7. Variations may be requested from a rule or decision. <strong>The</strong> request for variation shall specify how equivalent safety is to<br />

be maintained.<br />

2013 <strong>National</strong> <strong>Board</strong> Synopsis <strong>of</strong> <strong>Boiler</strong> <strong>and</strong> Pressure Vessel <strong>Laws</strong>, <strong>Rules</strong> <strong>and</strong> <strong>Regulations</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!