193<br />

b. Every time such an authorized person is called upon to inspect a vessel, he/she shall, in conformity with the regulations,<br />

complete a detailed report <strong>and</strong> file a copy with the department (which may recommend repair or alteration<br />

<strong>of</strong> the vessel whenever necessary);<br />

c. When the vessel is judged acceptable, a Certificate <strong>of</strong> Inspection is issued to its user.<br />

InSUranCe InSpeCtIOn reQUIrementS<br />

Periodic inspections by insurance company inspectors are accepted by the department.<br />

CertIFICate OF InSpeCtIOn<br />

1. Insured objects are certified by the insurance company responsible for the inspection. Uninsured objects are certified<br />

by the department.<br />

2. Validity <strong>of</strong> the periodic inspection certificate varies in accordance with the required frequency <strong>of</strong> periodic inspection.<br />

prOVInCIal FeeS<br />

1. Fees for registration <strong>and</strong> inspection, except for inservice inspection, are based on an hourly rate <strong>of</strong> $144.00 CAD. for<br />

the first hour <strong>and</strong> $69.00 per additional half hour. A $67.00 flat fee for traveling cost associated with inspection services.<br />

2. Fees for inservice inspection vary according to the type <strong>of</strong> vessel <strong>and</strong> its dimensions.<br />

3. Fees for the review <strong>of</strong> a quality control manual <strong>and</strong> the verification <strong>of</strong> its implementation are also based on an hourly<br />

rate <strong>of</strong> $144.00 CAD. for the first hour <strong>and</strong> $69.00 per additional half hour.<br />

<strong>The</strong> regulation contains a provision for automatic indexation <strong>of</strong> fees on April 1 <strong>of</strong> each year.<br />

mISCellaneOUS<br />

1. Repairs or alterations on any boiler or pressure vessel must be completed by authorized organizations or, alternatively,<br />

submitted to the department for approval.<br />

2. All welders <strong>and</strong> welding procedures used on boilers <strong>and</strong> pressure vessels must be qualified in accordance with Section<br />

IX <strong>of</strong> the ASME Code. Qualification tests must be witnessed by the department.<br />

3. Operation <strong>of</strong> power plants, heating plants, <strong>and</strong> refrigeration plants must be done by licensed operators. Type <strong>of</strong> attendance<br />

required by operators depends on plant kilowatt capacity.<br />

4. Permits are required for installation <strong>of</strong> any boiler or pressure vessel before it is put into operation.<br />