197<br />

19. Periodic inspection or shop inspection <strong>of</strong> boiler .......................................................................................$164.00 - $953.00 CAD<br />

20. Periodic inspection or shop inspection <strong>of</strong> pressure vessel ...................................................................$102.00 - $1,117.00 CAD<br />

21. Permit fee for installation, repair, or alteration <strong>of</strong> boiler ............................................................................$50.00 - $778.00 CAD<br />

22. Permit fee for installation, repair, or alteration <strong>of</strong> pressure vessel ...........................................................$26.00 - $932.00 CAD<br />

23. Permit fee for installation, repair, or alteration <strong>of</strong> refrigeration plant ......................................................$54.00 - $103.00 CAD<br />

24. Operating license for boiler ..............................................................................................................................$50.00 - $778.00 CAD<br />

25. Operating license for pressure vessel ..............................................................................................................$76.00 - $432.00 CAD<br />

26. Operating license for refrigeration plant ........................................................................................................$54.00 - $103.00 CAD<br />

27. License to operate as operator ........................................................................................................................$88.00 - $246.00 CAD<br />

28. Operator examination fee..................................................................................................................................$20.00 - $102.00 CAD<br />

29. NH3 storage <strong>and</strong> distribution plant license .............................................................................................$140.00 - $1,080.00 CAD<br />

mISCellaneOUS<br />

1. Pressure welders are subject to qualification tests.<br />

2. All low-pressure boilers <strong>of</strong> 50 hp or more <strong>and</strong> all high-pressure boilers <strong>of</strong> 15 hp or more shall be in the charge <strong>of</strong> a<br />

certified engineer or fireman as required in the regulations.<br />

3. New installations require prior approval <strong>of</strong> chief inspector.<br />

4. Chief inspector must be immediately notified by telephone or any other direct means <strong>of</strong> any explosion, serious fire,<br />

rupture, serious overheating <strong>of</strong> a boiler, pressure vessel, plant or pressure piping system; or any accident that causes<br />

death or serious injury to a person <strong>and</strong> arises out <strong>of</strong> the operation <strong>of</strong> a boiler, pressure vessel, plant, or pressure piping<br />

system.<br />

5. All pressure piping designs over 0.5 cubic meters in internal volume must be stamped by a pr<strong>of</strong>essional engineer.<br />

6. Additional construction regulations are in force <strong>and</strong> available, without charge, from the Authority.<br />

7. License is required to install or repair a boiler, pressure vessel, pressure piping system, or refrigeration plant.<br />

8. Operators <strong>of</strong> boilers <strong>and</strong> pressure vessels are required to be licensed. An operator must be in attendance during boiler<br />

operation.<br />

9. An annual license to operate is required for all boilers, pressure vessels, <strong>and</strong> refrigeration plants.<br />

10. Category A, B, C <strong>and</strong> G fittings, as set out in Table 1 <strong>of</strong> the CSA B51 code, are not required to be registered.<br />

11. All boilers <strong>and</strong> pressure vessels must be registered with a Saskatchewan CRN. Alternatively boilers <strong>and</strong> pressure vessels<br />

are not required to be registered with a Saskatchewan CRN if:<br />

a. the boiler or pressure vessel is:<br />

• constructed in strict compliance with the administrative <strong>and</strong> technical rules <strong>of</strong> the appropriate section <strong>of</strong> the<br />

ASME code;<br />

• stamped with the applicable code symbol stamp in accordance with the ASME code;<br />

• registered with NBBI;<br />

• the NBBI registration number is recorded on the data report <strong>and</strong> stamped on the name plate <strong>of</strong> the boiler or<br />

pressure vessel; <strong>and</strong><br />

• the owner has submitted the data report to the chief inspector for registration along with the appropriate<br />

registration fee.<br />

b. the boiler or pressure vessel is:<br />

• constructed in a province or territory <strong>of</strong> Canada other than Saskatchewan in strict compliance with the<br />

administrative <strong>and</strong> technical rules <strong>of</strong> the appropriate section <strong>of</strong> the CSA B51 code;<br />

• assigned a Canadian registration number by the boiler <strong>and</strong> pressure vessel authority <strong>of</strong> the province or territory<br />

in which it is constructed;<br />

• inspected during construction by an inspector employed by the boiler <strong>and</strong> pressure vessel authority <strong>of</strong> the<br />

province or territory in which it is constructed;<br />

• the registration number <strong>of</strong> the province or territory in which the boiler or pressure vessel is constructed is<br />

recorded on the data report required by the CSA B51 code <strong>and</strong> stamped on the name plate <strong>of</strong> the boiler or<br />

pressure vessel; <strong>and</strong><br />

• the owner has submitted the data report to the chief inspector for registration along with the appropriate<br />

registration fee.<br />

2013 <strong>National</strong> <strong>Board</strong> Synopsis <strong>of</strong> <strong>Boiler</strong> <strong>and</strong> Pressure Vessel <strong>Laws</strong>, <strong>Rules</strong> <strong>and</strong> <strong>Regulations</strong>