72<br />

ObJeCtS SUbJeCt tO rUleS FOr COnStrUCtIOn anD StampInG<br />

All boilers, except the following:<br />

1. Those under federal control.<br />

2. Swimming pool heaters <strong>and</strong> open car-wash heaters. Similar type equipment with no intervening valves on the return<br />

or discharge piping, <strong>and</strong> having no reduction in pipe size in the return or discharge piping (not generating more than<br />

normal circulating pump pressure).<br />

3. Miniature steam or marine engines for hobby usage.<br />

4. Those used in power plants <strong>of</strong> self-propelled vehicles designed primarily for the transportation <strong>of</strong> persons or property<br />

upon a highway, except vehicles used exclusively upon stationary rails or tracks.<br />

5. <strong>Boiler</strong>s used on mint farms for mint processing.<br />

6. A nonvaporizing, organic-fluid boiler, if the boiler meets all <strong>of</strong> the following criteria:<br />

a. <strong>The</strong> system is vented <strong>and</strong> does not have valves or restrictions in the pipe between the boiler <strong>and</strong> vent;<br />

b. <strong>The</strong> vent pipe is sized so that the thermal expansion <strong>of</strong> the fluid will not result in an increase in pressure on the<br />

system, which is verifiable with engineering data;<br />

c. <strong>The</strong> owner/user provides the <strong>Boiler</strong> Division with calculations performed by an engineer which verify that pressure<br />

due to thermal expansion cannot exist in the boiler as installed.<br />

7. Coil type Hot Water <strong>Boiler</strong>:<br />

As referenced in ASME Section I PG-2<br />

8. A low-pressure steam boiler that has a volume <strong>of</strong> less than 5 cubic feet <strong>and</strong> that does not have piped feed connections.<br />

9. A water tube or coil-type hot water heating boiler requiring forced circulation not exceeding any one <strong>of</strong> the following:<br />

a. Maximum water design temperature <strong>of</strong> 200 degrees Fahrenheit.<br />

b. Relief valve set pressure <strong>of</strong> 30 psi.<br />

c. Heat input <strong>of</strong> 200,000 BTU/hr.<br />

Exception: Modular or multiple boiler installations exceeding 1,000,000 BTU/hr input are not exempt.<br />

10. Those on Tribal L<strong>and</strong>.<br />

ObJeCtS SUbJeCt tO rUleS FOr FIelD InSpeCtIOn<br />

Same as OBJECTS SUBJECT TO RULES FOR CONSTRUCTION AND STAMPING, except:<br />

1. <strong>Boiler</strong>s used solely for agricultural purposes.<br />

2. Steam or vapor boilers not exceeding 15 psi <strong>and</strong> hot-water boilers not exceeding 160 psi or a temperature <strong>of</strong> 250°F<br />

(located in private residences or apartment or condo buildings <strong>of</strong> fewer than six families).<br />

InSpeCtIOnS reQUIreD<br />

1. A power boiler, process boiler, or high-pressure, high-temperature water boiler shall receive a certificate inspection<br />

annually <strong>and</strong> shall also be externally inspected annually, while under pressure, within six months from the date <strong>of</strong> the<br />

internal inspection.<br />

2. A low-pressure steam or vapor heating boiler shall receive a certificate inspection biennially.<br />

3. Hot-water heating <strong>and</strong> hot-water supply boilers shall receive a certificate inspection triennially.<br />

4. A nonvaporizing, organic-fluid boiler that is not exempt under these rules shall receive an external certificate inspection<br />

triennially.<br />

5. A miniature hobby locomotive boiler shall receive a certificate inspection annually.<br />

6. Antique traction boilers: triennial inspection for noncommercial, <strong>and</strong> annual inspection for commercial.<br />

All inspections <strong>of</strong> newly installed <strong>and</strong> secondh<strong>and</strong> boilers must be made by a department inspector.<br />

InSUranCe InSpeCtIOn reQUIrementS<br />

1. Inspections, except first inspections <strong>and</strong> inspections <strong>of</strong> secondh<strong>and</strong> boilers, made by inspectors employed by insurance<br />

companies <strong>and</strong> licensed by the department are accepted in lieu <strong>of</strong> inspections made by a department inspector.<br />

2013 <strong>National</strong> <strong>Board</strong> Synopsis <strong>of</strong> <strong>Boiler</strong> <strong>and</strong> Pressure Vessel <strong>Laws</strong>, <strong>Rules</strong> <strong>and</strong> <strong>Regulations</strong>