23.11.2012 Views

Laws, Rules and Regulations - The National Board of Boiler and ...

Laws, Rules and Regulations - The National Board of Boiler and ...

Laws, Rules and Regulations - The National Board of Boiler and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

213<br />

mUnICIpal Department<br />

Paul Hern<strong>and</strong>ez, Chief Mechanical Inspector<br />

City <strong>of</strong> Miami Building Department<br />

Inspection Services/Mechanical Section<br />

P.O. Box 330708<br />

Miami, FL 33233-0708<br />

Telephone —305.416.1136 Email — phern<strong>and</strong>ez@miamigov.com<br />

305.416.1130<br />

Fax — 305.416.2168<br />

Express mail only:<br />

444 SW 2 nd Avenue, 4 th Floor<br />

Miami, FL 33130<br />

empOWerment<br />

<strong>Board</strong> <strong>of</strong> <strong>Rules</strong> <strong>and</strong> Appeals empowered to make, alter, <strong>and</strong> amend rules <strong>and</strong> regulations.<br />

<strong>Boiler</strong> <strong>Board</strong>: No.<br />

Date OF laW paSSaGe: 1950<br />

mIamI, FlOrIDa<br />

Date <strong>of</strong> latest amendment to law: March 2002.<br />

Date rules <strong>and</strong> regulations implemented: 1950.<br />

Date <strong>of</strong> latest amendment to rules <strong>and</strong> regulations: March 2002.<br />

City ordinance: Miami–Dade County Code <strong>of</strong> Ordinance 2002, Article 1. Administration, Chapter 8. Building Code.<br />

rUleS FOr COnStrUCtIOn anD StampInG<br />

Construction:<br />

1. ASME Code (2001 Edition, 2002 Addendum), Sections I, IV, <strong>and</strong> VIII (Divisions 1, 2).<br />

2. Code addenda <strong>and</strong> case interpretations accepted automatically.<br />

3. Manufacturers are required to file a copy <strong>of</strong> the Manufacturer’s Data Report with the department before installation.<br />

Permit forms are required <strong>and</strong> furnished by the department.<br />

Stamping:<br />

Where appropriate, the following <strong>National</strong> <strong>Board</strong> stamps or ASME Code symbol stamps are required:<br />

1. <strong>National</strong> <strong>Board</strong>: none.<br />

2. ASME Code: none.<br />

ObJeCtS SUbJeCt tO rUleS FOr COnStrUCtIOn anD StampInG<br />

1. All boilers <strong>and</strong> pressure vessels are subject to the rules for construction <strong>and</strong> stamping, except the following:<br />

a. <strong>Boiler</strong>s <strong>and</strong> pressure vessels under federal control;<br />

b. Unfired pressure vessels meeting the requirements <strong>of</strong> the US Department <strong>of</strong> Transportation;<br />

c. <strong>Boiler</strong>s requiring annual inspection <strong>and</strong> certification by the State <strong>of</strong> Florida, Bureau <strong>of</strong> Explosives <strong>and</strong> Fire Equipment,<br />

<strong>Boiler</strong> Safety Section.<br />

ObJeCtS SUbJeCt tO rUleS FOr FIelD InSpeCtIOn<br />

Same as OBJECTS SUBJECT TO RULES FOR CONSTRUCTION AND STAMPING.<br />

IMPORTANT NOTICE: Every effort has been made to make<br />

this synopsis as accurate <strong>and</strong> complete as possible. However,<br />

jurisdictional laws, regulations <strong>and</strong> rules are subject to change<br />

without notice. As a result, the information contained herein is<br />

neither guaranteed nor warranted. User is advised to consult<br />

the jurisdiction’s chief inspector before reaching any decision that<br />

may have critical impact or significant financial consequences.<br />

MEMBER<br />

JURISDICTION<br />

2013 <strong>National</strong> <strong>Board</strong> Synopsis <strong>of</strong> <strong>Boiler</strong> <strong>and</strong> Pressure Vessel <strong>Laws</strong>, <strong>Rules</strong> <strong>and</strong> <strong>Regulations</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!