162<br />

4. Pressure vessels used for water conditioning <strong>and</strong> filtration.<br />

5. Pressure vessels used in processing <strong>and</strong> storing fermented beverages at temperatures not exceeding 140°F.<br />

Items 1 through 5 are required to meet the pressure-relief device requirements <strong>of</strong> the ASME Code listed or the applicable Wisconsin<br />

Administrative Code.<br />

ObJeCtS SUbJeCt tO rUleS FOr FIelD InSpeCtIOn<br />

Same as OBJECTS SUBJECT TO RULES FOR CONSTRUCTION AND STAMPING, except the following:<br />

1. <strong>Boiler</strong>s or pressure vessels regularly inspected by US government inspectors.<br />

2. Heating boilers located in private residences or in apartment buildings having fewer than three family units.<br />

3. Expansion tanks for hot-water heating boilers.<br />

4. <strong>Boiler</strong>s used exclusively for agricultural purposes.<br />

5. Hot-water supply boilers, water heaters, <strong>and</strong> hot-water storage tanks in which the temperature does not exceed 210°F.<br />

6. Pressure vessels having:<br />

a. An inside diameter not exceeding 6 inches, with no limit on pressure;<br />

b. A volume less than 5 cubic feet <strong>and</strong> an operating pressure less than 250 psig;<br />

c. A volume less than 1-1/2 cubic feet, with no limit on pressure;<br />

d. An internal or external operating pressure <strong>of</strong> not more than 15 psig, with no limitation on size.<br />

7. Pressure vessels which are used in accordance with the regulations <strong>of</strong> the US Department <strong>of</strong> Transportation.<br />

8. Vessels used for storage or processing <strong>of</strong> cold water, including those with air cushions.<br />

9. Air receivers having a volume less than 90 gallons or 12 cubic feet <strong>and</strong> a working pressure less than 200 psig, as stamped<br />

on the manufacturer’s nameplate.<br />

10. Any pressure vessel used as an integral part <strong>of</strong> an electrical circuit breaker.<br />

InSpeCtIOnS reQUIreD<br />

1. Power boilers: One annual internal inspection. Where an internal inspection is not possible because <strong>of</strong> construction, an<br />

external inspection will be accepted. Should operating conditions require longer periods between inspections, an extension<br />

<strong>of</strong> time may be granted upon written application to the department <strong>and</strong> written concurrence <strong>of</strong> inspection agency.<br />

2. Low-pressure steam <strong>and</strong> hot-water boilers: one external or internal inspection every 36 months.<br />

3. Pressure vessels: one external or internal inspection every 36 months.<br />

4. Anhydrous ammonia storage <strong>and</strong> nurse tanks: one inspection every 36 months.<br />

5. Power piping <strong>and</strong> welded refrigeration piping: welder documentation <strong>and</strong> material inspection prior to start <strong>of</strong> fabrication.<br />

InSUranCe anD InSpeCtIOn reQUIrementS<br />

1. Inspections made by inspectors employed by insurance companies <strong>and</strong> holding Certificates <strong>of</strong> Competency issued by the<br />

department are accepted in lieu <strong>of</strong> inspections made by a department inspector.<br />

2. Inspections made by inspectors employed by owners/users <strong>and</strong> holding Certificates <strong>of</strong> Competency issued by the department<br />

are accepted in lieu <strong>of</strong> inspections made by a department inspector.<br />

3. Reports <strong>of</strong> inspection must be filed with the department within 30 days after inspection on department forms (SBD-<br />

10663).<br />

4. External inspections shall be reported only when:<br />

a. An internal inspection is not possible because <strong>of</strong> construction (in which case report shall be marked “External” <strong>and</strong><br />

the reason for making an external inspection shall be given);<br />

b. Code violations or unsafe conditions are found.<br />

5. <strong>The</strong> department must be notified within 30 days <strong>of</strong> new business <strong>and</strong> discontinuance <strong>of</strong> insurance on forms acceptable to<br />

the department.<br />