23.11.2012 Views

Laws, Rules and Regulations - The National Board of Boiler and ...

Laws, Rules and Regulations - The National Board of Boiler and ...

Laws, Rules and Regulations - The National Board of Boiler and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

181<br />

2. Steam boilers on railway locomotives or any steam boiler subject to jurisdiction <strong>of</strong> the <strong>Board</strong> <strong>of</strong> Transport Commissioners<br />

<strong>of</strong> Canada.<br />

3. Marine steam boilers.<br />

4. Pressure vessels having internal or external pressure <strong>of</strong> 15 psig or less <strong>and</strong> having inside diameter <strong>of</strong> 6 inches or less.<br />

5. Pressure vessels located on locomotives <strong>and</strong> vehicles used for carrying passengers or freight.<br />

6. Pressure vessels used for containing flammable liquids or gases at temperatures over 300°F.<br />

7. Pressure vessels containing only water under pressure for domestic supply including those containing air, the pressure<br />

<strong>of</strong> which serves only as a cushion, or in air lift systems.<br />

8. Refrigeration plants having a capacity <strong>of</strong> 3 tons or less refrigeration in 24 hours.<br />

ObJeCtS SUbJeCt tO rUleS FOr FIelD InSpeCtIOn<br />

Same as OBJECTS SUBJECT TO RULES FOR CONSTRUCTION AND STAMPING.<br />

InSpeCtIOnS reQUIreD<br />

1. <strong>Boiler</strong>s: one annual inspection, alternating internal/external each year.<br />

2. Pressure vessels: periodic frequency <strong>of</strong> inspection determined by chief inspector.<br />

InSUranCe InSpeCtIOn reQUIrementS<br />

1. Inspections made annually by authorized inspectors employed by insurance companies registered in the province may<br />

be accepted in lieu <strong>of</strong> inspections made by a department inspector.<br />

2. Written report <strong>of</strong> all inspections or letters to insured must be filed with the department as soon as practical after<br />

inspection (includes completed data on each boiler).<br />

3. Department must be notified <strong>of</strong> suspension <strong>of</strong> insurance on account <strong>of</strong> dangerous conditions.<br />

4. Department must be notified <strong>of</strong> new business <strong>and</strong> discontinuance <strong>of</strong> insurance.<br />

CertIFICate OF InSpeCtIOn<br />

Certificate <strong>of</strong> Inspection – issued by the department or insurance company – may be held valid until canceled or suspended.<br />

prOVInCIal FeeS (see Web site for current pricing)<br />

Fees for installation <strong>and</strong> periodic inspections:<br />

1. Power boilers:<br />

a. Up to <strong>and</strong> including 250 square feet ..........................................................................................................................$45.50 CAD<br />

b. More than 250 square feet to 750 square feet ........................................................................................................$90.99 CAD<br />

c. More than 750 square feet to 2,000 square feet ..................................................................................................$136.49 CAD<br />

d. More than 2,000 square feet to 5,000 square feet ...............................................................................................$199.05 CAD<br />

e. More than 5,000 square feet to 15,000 square feet .............................................................................................$244.55 CAD<br />

f. More than 15,000 square feet to 30,000 square feet ...........................................................................................$307.10 CAD<br />

g. More than 30,000 square feet ...................................................................................................................................$307.10 CAD<br />

h. Plus $3.00 CAD per 500 square feet or part there<strong>of</strong> to maximum fee <strong>of</strong> .....................................................$853.12 CAD<br />

2. Pressure vessels <strong>and</strong> heat exchangers: the following fees shall apply to the first 10 feet <strong>of</strong> overall length, beyond which<br />

an additional fee <strong>of</strong> $20.00 CAD for each 10 feet or part there<strong>of</strong>:<br />

a. Up to 24-inch diameter ...............................................................................................................................................$34.12 CAD<br />

b. More than 24-inch diameter to 30 inches ...............................................................................................................$68.25 CAD<br />

c. More than 30-inch diameter to 50 inches ...............................................................................................................$79.62 CAD<br />

d. More than 50-inch diameter to 70 inches .............................................................................................................$102.37 CAD<br />

2013 <strong>National</strong> <strong>Board</strong> Synopsis <strong>of</strong> <strong>Boiler</strong> <strong>and</strong> Pressure Vessel <strong>Laws</strong>, <strong>Rules</strong> <strong>and</strong> <strong>Regulations</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!