23.11.2012 Views

Laws, Rules and Regulations - The National Board of Boiler and ...

Laws, Rules and Regulations - The National Board of Boiler and ...

Laws, Rules and Regulations - The National Board of Boiler and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

57<br />

3. Portable boilers used for agricultural purposes only.<br />

4. <strong>Boiler</strong>s built for a pressure <strong>of</strong> 15 psig or less, for noncommercial use.<br />

5. All potable water boilers <strong>and</strong> hot-water heaters, except the provisions <strong>of</strong> the section shall not be applicable to commercial<br />

potable water heaters <strong>of</strong> less than 50-gallon capacity, installed in commercial buildings.<br />

ObJeCtS SUbJeCt tO rUleS FOr FIelD InSpeCtIOn<br />

Same as OBJECTS SUBJECT TO RULES FOR CONSTRUCTION AND STAMPING.<br />

InSpeCtIOnS reQUIreD<br />

Power boilers <strong>and</strong> high-pressure or high-temperature water boilers:<br />

1. An annual external inspection followed by an internal inspection approximately six months after each external inspection.<br />

<strong>The</strong> interval between inspections may be extended for a period not to exceed 24 months on a stationary boiler<br />

provided:<br />

a. Continuous water treatment under competent <strong>and</strong> experienced supervision has been in effect since the last internal<br />

inspection for the purpose <strong>of</strong> controlling <strong>and</strong> limiting corrosion <strong>and</strong> deposits;<br />

b. Conditions are such that in the judgment <strong>of</strong> the assistant secretary, the inspection period may be extended.<br />

2. Internal inspections may be extended up to 60 months on boilers that are adjunct to or part <strong>of</strong> a continuous process.<br />

Fee is $200.00.<br />

Low-pressure boilers:<br />

A certificate inspection will be conducted biennially:<br />

1. Steam or vapor boilers: An external inspection <strong>and</strong> internal inspection biennially where construction permits;<br />

2. Hot-water heating <strong>and</strong> hot-water supply boilers: An external certificate inspection biennially, <strong>and</strong> – where construction<br />

permits — an internal inspection every six years based on date <strong>of</strong> construction;<br />

3. Potable water boilers/hot-water heaters: An external certificate inspection biennially.<br />

InSUranCe InSpeCtIOn reQUIrementS<br />

1. Inspections made by inspectors employed by insurance companies <strong>and</strong> commissioned by the department are accepted<br />

in lieu <strong>of</strong> inspections made by deputy boiler inspectors.<br />

2. Reports <strong>of</strong> inspections must be submitted to the boiler inspection section within 30 days on <strong>National</strong> <strong>Board</strong> forms.<br />

3. <strong>The</strong> department must be notified <strong>of</strong> suspension <strong>of</strong> insurance on account <strong>of</strong> dangerous conditions or <strong>of</strong> accidents to insured<br />

boilers on <strong>National</strong> <strong>Board</strong> forms.<br />

4. <strong>The</strong> department must be notified <strong>of</strong> new business or discontinuance <strong>of</strong> insurance.<br />

CertIFICate OF InSpeCtIOn<br />

1. Certificate <strong>of</strong> Inspection, valid for not more than 14 months, is issued by the state fire marshal upon payment <strong>of</strong> a fee <strong>of</strong><br />

$20.00. Certificate valid for not more than 26 months: $40.00.<br />

2. All invoicing will be done by the boiler inspection section <strong>and</strong> mailed to the location.<br />

3. No Inspection Certificate issued for an insured boiler shall be valid after the boiler for which it was issued ceases to be<br />

insured by a duly authorized insurance company.<br />

State FeeS<br />

1. Potable water boilers/hot-water heaters .................................................................................................................................... $15.00<br />

2. Heating boilers .................................................................................................................................................................................. $35.00<br />

3. External power boilers:<br />

a. 100 square feet or less heating surface ............................................................................................................................... $20.00<br />

b. Over 100 square feet to 1,000 square feet heating surface ........................................................................................... $35.00<br />

2013 <strong>National</strong> <strong>Board</strong> Synopsis <strong>of</strong> <strong>Boiler</strong> <strong>and</strong> Pressure Vessel <strong>Laws</strong>, <strong>Rules</strong> <strong>and</strong> <strong>Regulations</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!