11.07.2015 Views

Catalyst 3750-E and 3560-E Switch Cisco IOS ... - DNIP . NET

Catalyst 3750-E and 3560-E Switch Cisco IOS ... - DNIP . NET

Catalyst 3750-E and 3560-E Switch Cisco IOS ... - DNIP . NET

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

cluster enableChapter 2<strong>Catalyst</strong> <strong>3750</strong>-E <strong>and</strong> <strong>3560</strong>-E <strong>Switch</strong> <strong>Cisco</strong> <strong>IOS</strong> Comm<strong>and</strong>scluster enableUse the cluster enable global configuration comm<strong>and</strong> on a comm<strong>and</strong>-capable switch or switch stack toenable it as the cluster comm<strong>and</strong> switch, assign a cluster name, <strong>and</strong> to optionally assign a membernumber to it. Use the no form of the comm<strong>and</strong> to remove all members <strong>and</strong> to make the cluster comm<strong>and</strong>switch a c<strong>and</strong>idate switch.cluster enable name [comm<strong>and</strong>-switch-member-number]no cluster enableSyntax Descriptionnamecomm<strong>and</strong>-switch-member-numberName of the cluster up to 31 characters. Valid characters includeonly alphanumerics, dashes, <strong>and</strong> underscores.(Optional) Assign a member number to the cluster comm<strong>and</strong>switch of the cluster. The range is 0 to 15.DefaultsThe switch is not a cluster comm<strong>and</strong> switch.No cluster name is defined.The member number is 0 when the switch is the cluster comm<strong>and</strong> switch.Comm<strong>and</strong> ModesGlobal configurationComm<strong>and</strong> HistoryRelease12.2(35)SE2ModificationThis comm<strong>and</strong> was introduced.Usage GuidelinesEnter this comm<strong>and</strong> on any comm<strong>and</strong>-capable switch that is not part of any cluster. This comm<strong>and</strong> failsif a device is already configured as a member of the cluster.You must name the cluster when you enable the cluster comm<strong>and</strong> switch. If the switch is alreadyconfigured as the cluster comm<strong>and</strong> switch, this comm<strong>and</strong> changes the cluster name if it is different fromthe previous cluster name.ExamplesThis example shows how to enable the cluster comm<strong>and</strong> switch, name the cluster, <strong>and</strong> set the clustercomm<strong>and</strong> switch member number to 4.<strong>Switch</strong>(config)# cluster enable Engineering-IDF4 4You can verify your setting by entering the show cluster privileged EXEC comm<strong>and</strong> on the clustercomm<strong>and</strong> switch.2-114<strong>Catalyst</strong> <strong>3750</strong>-E <strong>and</strong> <strong>3560</strong>-E <strong>Switch</strong> Comm<strong>and</strong> ReferenceOL-9776-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!