11.07.2015 Views

Catalyst 3750-E and 3560-E Switch Cisco IOS ... - DNIP . NET

Catalyst 3750-E and 3560-E Switch Cisco IOS ... - DNIP . NET

Catalyst 3750-E and 3560-E Switch Cisco IOS ... - DNIP . NET

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

power rpsChapter 2<strong>Catalyst</strong> <strong>3750</strong>-E <strong>and</strong> <strong>3560</strong>-E <strong>Switch</strong> <strong>Cisco</strong> <strong>IOS</strong> Comm<strong>and</strong>spower rpsTo configure <strong>and</strong> manage the <strong>Cisco</strong> Redundant Power System 2300, also referred to as the RPS 2300,connected to a <strong>Catalyst</strong> <strong>3750</strong>-E switch stack or a st<strong>and</strong>alone switch , use the power rps user EXECcomm<strong>and</strong>.power rps switch-number {name {string | serialnumber} | port rps-port-id {mode {active |st<strong>and</strong>by}{priority priority}Syntax Descriptionswitch-numbername {string |serialnumber}Specify the stack member to which the RPS 2300 is connected. The rangeis 1 to 9, depending on the switch member numbers in the stack.This parameter is available only on <strong>Catalyst</strong> <strong>3750</strong>-E switches.Set the name of the RPS:• Enter a string to specify the name such as port1 or “port 1”. Usingquotation marks before <strong>and</strong> after the name is optional, but you mustuse quotation marks if you want to include spaces in the port name.The name can have up to 16 characters.• Enter the serialnumber keyword to configure the switch to use theRPS serial number as the name.port rps-port-id Specify the RPS port. The range is from 1 to 6.mode {active | st<strong>and</strong>by} Set the mode of the RPS port:priority priority• active—The RPS can provide power to a switch when the switchinternal power supply cannot.• st<strong>and</strong>by—The RPS is not providing power to a switch.Set the priority of the RPS port. The range is from 1 to 6, where 1 is thehighest priority <strong>and</strong> 6 is the lowest priority.DefaultsThe name of the RPS 2300 is not configured.The RPS ports are in active mode.The RPS port priority is 6.Comm<strong>and</strong> ModesUser EXECComm<strong>and</strong> HistoryRelease12.2(35)SE2ModificationThis comm<strong>and</strong> was introduced.Usage GuidelinesThe power rps comm<strong>and</strong> applies only to an RPS 2300 connected to a <strong>Catalyst</strong> <strong>3560</strong>-E switch, a<strong>Catalyst</strong> <strong>3750</strong>-E st<strong>and</strong>alone switch, or a switch stack with only <strong>Catalyst</strong> <strong>3750</strong>-E switches.When configuring an RPS 2300 in a switch stack with only <strong>Catalyst</strong> <strong>3750</strong>-E switches, you must specifythe stack member before entering the name or serial number of the RPS.2-444<strong>Catalyst</strong> <strong>3750</strong>-E <strong>and</strong> <strong>3560</strong>-E <strong>Switch</strong> Comm<strong>and</strong> ReferenceOL-9776-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!