Effect<br />

Temporary light spill impacts due<br />

to the use <strong>of</strong> construction lighting<br />

Sydney City Centre Capa<strong>city</strong> Improvement Plan<br />

Review <strong>of</strong> Environmental Factors<br />

Affected<br />

<strong>factors</strong>/receivers<br />

Road users<br />

Members <strong>of</strong> the<br />

public<br />

Adjacent businesses<br />

Road users<br />

Landscape character and visual impacts – operation<br />

Low adverse impact on the<br />

streetscape character <strong>of</strong> certain<br />

roads due to the change and<br />

altered influence traffic would<br />

have within the road corridor<br />

Low to moderate visual impact on<br />

certain receivers due to the<br />

change and altered influence<br />

traffic would have within the road<br />

corridor in locations where the<br />

roads are framed by sensitive<br />

(heritage-listed) buildings<br />

Removal <strong>of</strong> seven ‘non-significant<br />

‘ planted trees and the potential<br />

requirement to prune or work<br />

within the root zone <strong>of</strong> eight<br />

additional planted trees<br />

Water quality and hydrology –construction<br />

Residual risk <strong>of</strong> an accidental<br />

spillage<br />

Residual risk <strong>of</strong> sediment-laden<br />

run<strong>of</strong>f including stockpile run<strong>of</strong>f<br />

Potential to encounter<br />

contaminated fill during<br />

construction<br />

Residual risk <strong>of</strong> parts <strong>of</strong> the<br />

proposal footprint flooding<br />

Air quality – construction<br />

Temporary generation <strong>of</strong> dust,<br />

construction equipment and<br />

Members <strong>of</strong> the<br />

public<br />

Adjacent businesses<br />

Roadside properties<br />

Heritage-listed<br />

buildings<br />

Adjacent businesses<br />

Roadside properties<br />

Members <strong>of</strong> the<br />

public<br />

Trees<br />

Members <strong>of</strong> the<br />

public<br />

Members <strong>of</strong> the<br />

public<br />

Water quality<br />

Biodiversity values<br />

Members <strong>of</strong> the<br />

public<br />

Water quality<br />

Biodiversity values<br />

Construction<br />

workforce<br />

Water quality<br />

Members <strong>of</strong> the<br />

public<br />

Construction<br />

workforce<br />

Environmental<br />

receivers<br />

Members <strong>of</strong> the<br />

public<br />

Location<br />

(also refer Figure 1-1)<br />

Work sites: R2, S5, C1,<br />

C2 and F1<br />

Work sites: NW2, R2,<br />

R5, S3, C2 and F1<br />

Work sites:NW2, R1,<br />

R2, R4, R5, S2, S4, S6,<br />

C1 and F1<br />

Work sites: R2, S5, C1,<br />

C2 and F1<br />

The entire proposal<br />

footprint and associated<br />

haulage routes<br />

The entire proposal<br />

footprint<br />

Work sites: S4 and S5<br />

Work sites: NW2, R1,<br />

R5, S3, S4, C1, F1 and<br />

F2<br />

The entire proposal<br />

footprint<br />

ix