Impact Environmental safeguard Responsibility Timing<br />

Potential for<br />

construction<br />

vibration<br />

causing<br />

structural<br />

damage and<br />

human<br />

discomfort at all<br />

work sites<br />

except F1 and<br />

F2<br />

Potential noise<br />

and vibration<br />

nuisance and<br />

amenity<br />

impacts during<br />

construction.<br />

Affects the<br />

entire proposal<br />

footprint<br />

Undertake a location-specific<br />

vibration assessment prior to<br />

construction where there is the<br />

planned use <strong>of</strong> a vibratory roller.<br />

The survey should assess all<br />

receivers within the distance limits<br />

specified in Table 6-15 depending<br />

on the size <strong>of</strong> vibratory roller that<br />

would be used on site.<br />

Undertake the following actions in<br />

locations where there is the<br />

potential for vibration impacts:<br />

Building condition surveys for<br />

any locations identified to be<br />

within the safe working<br />

distance both before and after<br />

the works to identify existing<br />

damage and any damage due<br />

to the works<br />

Vibration monitoring during<br />

vibration intensive works<br />

In the case that exceedances<br />

are detected, <strong>review</strong> the<br />

situation and identify means to<br />

minimise impacts to residents<br />

and the appropriate changes<br />

made and the CNVMP<br />

updated accordingly.<br />

Restrict the use <strong>of</strong> any vibratory<br />

rollers above four tonnes.<br />

If this is not feasible implement<br />

respite periods to manage human<br />

comfort impacts.<br />

Provide a 24-hour community<br />

hotline for complaints and queries<br />

concerning construction and<br />

advertise this ahead <strong>of</strong> starting<br />

any work.<br />

Develop a complaints handling<br />

procedure.<br />

Inform the community in advance<br />

<strong>of</strong> commencing any planned<br />

works, through advertisement,<br />

flyers and community consultation<br />

sessions.<br />

Construction<br />

contractors<br />

Construction<br />

contractor<br />

Preconstruction<br />

Preconstruction<br />

Make the construction program<br />

available to the community and<br />

ensure it is routinely updated as<br />

works progress.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 229<br />

Review <strong>of</strong> Environmental Factors