24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Typical improvement (with<br />

example)<br />

Features<br />

Market Street (R4) Tree pruning or removal<br />

<br />

<br />

<br />

<br />

<br />

<br />

Bus lane marking<br />

alterations or instalment<br />

Road regrading and<br />

resurfacing<br />

Traffic signal and lighting<br />

pole works<br />

Surface drainage<br />

modification and relocation<br />

Bus shelter relocation<br />

Utility works<br />

Typical construction activities associated with each stage <strong>of</strong> work (refer to<br />

section 3.3)<br />

Stage 2: Modification and alteration works<br />

Major equipment relocation<br />

Tree pruning and removal<br />

Lighting pole relocation<br />

Drainage modifications<br />

Bus shelter removal (refer to section 6.5.4 with regard to overall temporary<br />

relocation strategy)<br />

Utility works<br />

Stage 3: Signage and traffic signal alterations and bus lane markings<br />

Bus lane markings (where required)<br />

Stage 4: Reinstatement, refurbishment and post works<br />

Regrading and resurfacing (where required)<br />

Lighting pole relocation<br />

Major equipment relocation<br />

Re-establish the footpath by installing pavers, concrete or asphalt to match<br />

the surrounding.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 60<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!