Table 6-64<br />

Construction hazard identification and consequence assessment<br />

Hazard Potential consequence Key sensitive locations<br />

Accidental fuel and chemical<br />

spillage due to poor<br />

management, equipment<br />

failure or a road traffic accident<br />

Accidental discharge <strong>of</strong><br />

sediment laden/contaminated<br />

run<strong>of</strong>f<br />

Hazardous material and<br />

dangerous goods<br />

transportation:<br />

Worksite and road traffic<br />

accidents (workforce and<br />

pedestrian safety)<br />

Fire and/or explosion through<br />

poor materials handling,<br />

storage and management<br />

Restricted or delayed<br />

emergency access to site for<br />

essential maintenance<br />

Emergency vehicle access<br />

delays<br />

Dust and pollutant emissions<br />

Pedestrian and cyclists safety<br />

issues due to: cyclists mixing<br />

with general traffic lanes, bus<br />

lanes or using footpaths where<br />

provisions are restricted;<br />

pedestrian crossing restricting<br />

forcing people to cross at<br />

undesignated locations; and<br />

pedestrians forced to stand <strong>of</strong>f<br />

the kerbside in congested<br />

locations due to footpath<br />

restrictions<br />

Water pollution and<br />

ground contamination<br />

Human health impacts<br />

(injury or death through<br />

vehicle strikes)<br />

Water/air pollution<br />

and/or ground<br />

contamination<br />

Human health impact<br />

as a result <strong>of</strong> delayed<br />

access times<br />

Air pollution and<br />

nuisance<br />

Injury or death<br />

All locations in the proposal<br />

footprint, however the risks<br />

would be potentially greater<br />

above the Deep Creek and<br />

Gymea soils due to its high<br />

erodability as discussed in<br />

section 6.8.2.<br />

All locations across the<br />

study area; however the<br />

risks would be potentially<br />

greater in the main work<br />

sites (due to greater<br />

construction traffic), site<br />

access and exit points,<br />

roads with altered traffic<br />

conditions, haulage routes<br />

and compound entrances.<br />

All locations in the proposal<br />

footprint, however the risks<br />

would be potentially greater<br />

above the Deep Creek and<br />

Gymea soils due to its high<br />

erodability as discussed in<br />

section 6.8.2.<br />

Across the entire proposal<br />

footprint.<br />

Restricted to locations in the<br />

proposal footprint where<br />

adjacent receivers may be<br />

affected (refer to section<br />

6.12.1).<br />

Locations where footpath<br />

closures would be<br />

implemented or cycleway<br />

restrictions would be<br />

implemented.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 407<br />

Review <strong>of</strong> Environmental Factors