24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

No Impact Environmental safeguard Responsibility Timing<br />

<br />

<br />

<br />

procedures<br />

Monitoring and sampling procedure for landfill seepage<br />

(leachate)<br />

A procedure for dewatering and disposal <strong>of</strong> potentially<br />

contaminated liquid waste<br />

A stop work procedure in the event that indications <strong>of</strong><br />

contamination are encountered (known and unexpected,<br />

including odorous or visual indicators) and for a<br />

contamination assessment to be prepared to advise on the<br />

need for remediation or other action, as deemed appropriate<br />

A process for <strong>review</strong>ing and updating the plan.<br />

Note: The CMP would be <strong>review</strong>ed by Roads and Maritime prior<br />

to construction.<br />

55 Low residual risk <strong>of</strong><br />

generating ASS during<br />

construction (particularly at<br />

work sites NW2 and R3).<br />

Prepare an ASS Management Plan in accordance with the<br />

Guidelines for the Management <strong>of</strong> Acid Sulphate Materials<br />

(Roads and Maritime, 2005) if it is confirmed through further<br />

assessment and sampling that the soils trigger the action criteria<br />

in the ASS Manual (ASSMAC, 1998).<br />

Ensure the plan details the controls needed when undertaking<br />

the works such that they would not lead to undue oxidation <strong>of</strong><br />

the soil and therefore its acidification.<br />

Construction<br />

contractor<br />

Pre-construction<br />

Construction<br />

Biodiversity<br />

56 Biodiversity management<br />

across the entire proposal<br />

footprint.<br />

Prepare a biodiversity management plan (BMP) as a sub-plan <strong>of</strong><br />

the CEMP. As a minimum, the plan would:<br />

<br />

Provide for the discovery <strong>of</strong> unexpected threatened flora or<br />

fauna. The provisions <strong>of</strong> Standard Management Procedure:<br />

Unexpected Threatened Species Finds (Roads and Maritime,<br />

2011) would be subsequently implemented.<br />

Construction<br />

contractor<br />

Pre-construction<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 452<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!