24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Typical improvement (with<br />

example)<br />

Features<br />

combination with the removal <strong>of</strong><br />

a kerb extension.<br />

Typical construction activities associated with each stage <strong>of</strong> work (refer to<br />

section 3.3)<br />

Stage 4: Reinstatement, refurbishment and post works<br />

Relocate or install stone, trachyte or concrete kerb/kerb ramp to new<br />

alignment<br />

Reinstall the kerb where required<br />

Lane marking alterations<br />

Localised patching and resurfacing (where required)<br />

3: Footpath width alterations<br />

Along the northern footpath<br />

on Market Street between<br />

Clarence Street and York<br />

Street (R2)<br />

Footpath widths would be<br />

increased or decreased<br />

between intersections to<br />

improve the geometry on the<br />

approach to, exit from, or<br />

through an intersection, or to<br />

alter the existing lane<br />

arrangements (refer to<br />

improvement No. 6 below).<br />

Stage 5: Site hand back<br />

Temporary traffic management (removal) (where required)<br />

Temporary footpath restriction/closure (removal) (where required)<br />

Remove <strong>environmental</strong> controls (refer to Chapter 7)<br />

Stage 1: Establishment works<br />

Temporary traffic management (establishment) (where required)<br />

Temporary footpath restriction/closure (establishment) (where required)<br />

Install <strong>environmental</strong> controls (refer to Chapter 7)<br />

Stage 2: Modification and alteration works<br />

Saw-cut kerb/kerb ramp, footpath, road surface, median<br />

Store existing pavers for reuse (where required)<br />

Remove materials to support the new kerb/median alignment and depth<br />

(termed ‘boxing out’) (where required)<br />

Remove spoil and waste from site to one <strong>of</strong> the construction<br />

compounds/temporary laydown areas (refer to section 3.4.2)<br />

Construct new base for kerb/kerb ramp/median (where required)<br />

Sydney City Centre Capa<strong>city</strong> Improvement 56<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!