24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Work site<br />

Precinct 3: southern<br />

Predicted change in road traffic<br />

noise level<br />

(dB)<br />

Day<br />

Night<br />

S1: Sussex Street 0.1 0.1<br />

S2: Goulburn Street 0.4 to 1.4 0.4 to 1.4<br />

S3: Pitt Street 0.4 to 1.4 0.4 to 1.4<br />

S4: Ultimo Road 0 0<br />

S5: Broadway 0 to 1 0 to 1<br />

S6: Pitt Street 0 0 to 0.1<br />

Precinct 4: college<br />

C1: Wentworth Avenue 0.5 to 1.6 0.5 to 2.3<br />

C2: College Street 0.6 to 1.6 0.6 to 1.6<br />

Precinct 5: financial<br />

F1: Macquarie Street 0.2 0.2<br />

F2: Macquarie Street 0 0<br />

Table 6-19 shows that the proposal would marginally increase operational road traffic<br />

noise. Generally however the changes would be imperceptible as they would be less<br />

the 2 dB criterion described in section 6.2.2. However, one road section at<br />

Wentworth Avenue (work site: C1) shows a marginal predicted exceedance <strong>of</strong> the<br />

2 dB incremental change noise criterion for the night-time period.<br />

As noted above, the modelled predictions represent a worst-case scenario as they<br />

have assumed the maximum increase in traffic volumes and that any created<br />

additional traffic lanes would operate full-time. In reality however traffic would be<br />

allowed to park along much <strong>of</strong> the kerb on Wentworth Avenue (work site: C1) at<br />

night; therefore this predicted increase is very conservative and is not likely to result<br />

in a perceptible increase in traffic noise at this location.<br />

Operational vibration<br />

No additional operational vibration sources would be introduced through the<br />

proposal. As such, there would be a neutral impact once the proposal is operational.<br />

6.2.5 Safeguards and management measures<br />

Table 6-20 lists the noise and vibration safeguards and management measures that<br />

would be implemented to account for the potential impacts identified above in<br />

section 6.2.4.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 226<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!