24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Item name<br />

4 ‘Ashdown & Co’ building<br />

5 ‘Sydney Arcade’ building<br />

Precinct 2: retail<br />

R1 Park Street<br />

Works with potential heritage impacts (numbers relate<br />

to typical traffic capa<strong>city</strong> improvements in Table 3-2)<br />

2: Kerb extension alterations<br />

Reduce the length <strong>of</strong> the mid-block southern kerb<br />

extension on King Street<br />

5: Kerbside allocation modifications<br />

Alter the parking provisions on the southern kerb<br />

Supporting work<br />

Drainage works<br />

Relocate lighting pole<br />

Relocate road furniture<br />

(relates to Work sites: I & J)<br />

Potential impact<br />

<br />

<br />

<br />

<br />

<br />

Minor adverse impact due to slight change in<br />

road furniture configuration, lighting pole<br />

relocation and potential signage layout along<br />

the building frontage affecting its context and<br />

setting<br />

No impact to the realigned kerbs as they are<br />

<strong>of</strong> recent construction.<br />

No impact as the changes would have no<br />

direct impact or affect the context or setting <strong>of</strong><br />

this building<br />

No impact to the realigned kerbs as they are<br />

<strong>of</strong> recent construction<br />

Minor adverse impact due to reducing the<br />

length <strong>of</strong> the mid-block southern kerb<br />

extension due to the increased risk <strong>of</strong> highsided<br />

vehicles striking the heritage-listed<br />

awning.<br />

1 Criterion Hotel<br />

2: Kerb extension alterations<br />

Alter the kerb extensions in Pitt Street on the southwest<br />

and south-east corner <strong>of</strong> the intersection<br />

5: Kerbside allocation modifications<br />

Alter parking provisions on both sides <strong>of</strong> the road:<br />

Supporting work<br />

Drainage work<br />

Regrade and resurface the road<br />

(relates to Work site: A)<br />

<br />

<br />

No impact as the changes would have no<br />

direct impact or affect the context or setting <strong>of</strong><br />

this building<br />

No impact to the realigned kerbs as they are<br />

<strong>of</strong> recent construction.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 249<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!