24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Wemyss Lane to Goulburn Street<br />

Ref (refer<br />

Fig 3-17<br />

to 3-19)<br />

Proposal description<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

D<br />

<br />

Improve the kerb alignment<br />

immediately north <strong>of</strong> Lyons Lane<br />

on the western kerb.<br />

Type No. 3: Footpath width alterations:<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath<br />

restrictions/closure<br />

<br />

Kerb/kerb ramp relocation<br />

<br />

Footpath alterations<br />

<br />

Signage relocation.<br />

Supporting work:<br />

<br />

Modify the existing drainage pipe<br />

outlet immediately north <strong>of</strong> Lyons Lane<br />

on the western kerb.<br />

<br />

Improve the kerb alignment<br />

immediately north <strong>of</strong><br />

Commonwealth Street on the<br />

western kerb.<br />

Type No. 3: Footpath width alterations:<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath<br />

restrictions/closure<br />

<br />

Kerb/kerb ramp relocation<br />

<br />

Footpath alterations<br />

<br />

Signage relocation.<br />

Supporting work:<br />

<br />

Replace the existing gutter<br />

immediately north <strong>of</strong> Commonwealth<br />

Street on the western kerb<br />

<br />

Relocate the drainage onto the new<br />

kerb line immediately north <strong>of</strong><br />

Commonwealth Street on the western<br />

kerb<br />

<br />

Remove the existing mature<br />

Cottonwood Poplar tree<br />

<br />

Relocate the two bicycle rings on the<br />

street signs (if the signs are removed)<br />

<br />

Relocate the rubbish bin.<br />

Restrict the general parking and<br />

motorbike parking on the eastern kerb:<br />

<br />

<br />

Introduce ‘no stopping’ restrictions<br />

during the weekday morning and<br />

afternoon peak periods<br />

Provide an additional loading zone<br />

in the inter peak period.<br />

Alter the parking and loading provisions<br />

on the western kerb:<br />

<br />

Introduce ‘no stopping’ during the<br />

weekday morning and afternoon<br />

peak periods.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

Signage relocation<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

Remove the parking ticket vending<br />

machine.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Signage relocation<br />

Lane marking alterations.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 110<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!