24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Item name<br />

R2 Market Street<br />

Works with potential heritage impacts (numbers relate<br />

to typical traffic capa<strong>city</strong> improvements in Table 3-2)<br />

1<br />

3<br />

Queen Victoria Building<br />

Commonwealth Bank<br />

2: Kerb extension alterations<br />

Remove the north-east kerb extension on York Street<br />

immediately north <strong>of</strong> the intersection<br />

Slightly modify the south-east kerb between York<br />

Street immediately south <strong>of</strong> the intersection<br />

3: Footpath width alteration<br />

Reduce the northern kerb footpath to improve through<br />

geometry<br />

Supporting work<br />

Drainage work<br />

Relocate road furniture<br />

Remove trees<br />

Utility adjustment<br />

(relates to Work sites: E, F & G)<br />

2<br />

‘Archway Terrace’<br />

warehouse<br />

Assessed under work site R4(K) -<br />

4 ‘Gowing Bros’ building 5: Kerbside allocation modifications<br />

5 ‘Crystal Hotel’ building<br />

Alter the parking provisions on both kerbs<br />

(relates to Work sites: G & H)<br />

Potential impact<br />

<br />

<br />

<br />

<br />

No impact as the changes would have no<br />

direct impact or affect the context or setting <strong>of</strong><br />

these buildings<br />

No impact to the realigned kerbs as they are<br />

<strong>of</strong> recent construction<br />

No impact as a result <strong>of</strong> the tree loss as the<br />

trees are a modern feature with no historical<br />

association to the building.<br />

Minor adverse impact due to potential change<br />

in signage layout along the building frontage<br />

affecting its context and setting.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 250<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!