No Impact Environmental safeguard Responsibility Timing<br />

78 Manage the design to<br />

accommodate the climate<br />

change <strong>factors</strong> <strong>of</strong> increased<br />

temperature and rainfall<br />

events across the whole<br />

proposal.<br />

Hazards and risks<br />

79 Construction hazard and<br />

risk management across<br />

the proposal.<br />

80 Accidental spillage and<br />

discharge across the<br />

proposal during<br />

construction.<br />

81 Workforce and pedestrian<br />

and cyclist safety during<br />

construction across the<br />

proposal.<br />

82 Workforce and pedestrian<br />

and cyclist safety during<br />

construction across the<br />

proposal.<br />

83 Workforce and pedestrian<br />

and cyclist safety during<br />

construction across the<br />

proposal.<br />

Adopt the latest pavement design to ensure resilience against<br />

extreme temperature and rainfall events.<br />

Prepare a hazard and risk management plan (HRMP) as a subplan<br />

<strong>of</strong> the CEMP. As a minimum, the plan would:<br />

Include an emergency response plan<br />

Be prepared by a suitably qualified hazard management<br />

specialist<br />

Provide for the implementation, monitoring and maintenance<br />

<strong>of</strong> the identified hazard controls.<br />

<br />

<br />

Keep wet and dry spill kit, sand-filled/gravel-filled socks and<br />

geotextile matting ‘onsite’ at all times.<br />

Train staff in the appropriate deployment, use, removal and<br />

disposal <strong>of</strong> spill kit.<br />

Fence <strong>of</strong>f and secure all work sites to prevent public access.<br />

Backfill or cover all open excavations with boards/plates outside<br />

<strong>of</strong> working hours.<br />

Retain exclusion fencing and traffic control measures at all times<br />

unless their removal is a condition <strong>of</strong> the road occupancy licence<br />

(ROL) in which case make the construction site safe and<br />

demobilise between occupancy periods.<br />

Roads and<br />

Maritime<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Detailed design<br />

Preconstruction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 458<br />

Review <strong>of</strong> Environmental Factors