24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

No Impact Environmental safeguard Responsibility Timing<br />

57 Impacts on non-listed<br />

species across the entire<br />

proposal footprint.<br />

58 Impacts on non-listed<br />

species across the entire<br />

proposal footprint.<br />

59 Impacts on non-listed<br />

species across the entire<br />

proposal footprint.<br />

Waste management and resource use<br />

60 Waste generation during<br />

construction across the<br />

proposal.<br />

61 Waste generation during<br />

construction across the<br />

proposal.<br />

<br />

<br />

Prepare a detailed arboricultural survey (refer to section<br />

6.6.4) to identify mature and hollow-bearing trees that may be<br />

impacted by the proposal<br />

Implement measures to avoid or reduce impacts on these<br />

trees in line with those described above.<br />

As a precautionary measure ensure a qualified ecologist<br />

would be present during the felling/pruning <strong>of</strong> any identified<br />

hollow-bearing trees to manage wildlife that may be disturbed<br />

and/or injured.<br />

The ecologist would assess the species and then release them to<br />

the nearest suitable habitat if uninjured.<br />

<br />

<br />

<br />

As a precautionary measure close-<strong>of</strong>f all excavations<br />

overnight, in locations where night works are not planned, to<br />

prevent animals becoming trapped<br />

Inspect each excavation prior to the works starting in the<br />

morning<br />

Have a designated qualified person would capture any<br />

inadvertently trapped species and release the species into<br />

the nearest suitable habitat if uninjured.<br />

Deliver the proposal in accordance with Roads and Maritime<br />

waste-management policies<br />

Adopt the waste and resource management hierarchy in all work<br />

method statements.<br />

Classify, handle and store all removed waste in the construction<br />

compounds/laydown areas in accordance with the NSW Waste<br />

Classification Guidelines 2009: Part 1 Classifying Waste<br />

(DECCW) and Storing and Handling liquids, Environmental<br />

Protection (DECC, 2007).<br />

Roads and<br />

Maritime<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor/<br />

Maintenance<br />

contractor<br />

Pre-construction<br />

Construction<br />

Construction<br />

Pre-construction<br />

and construction<br />

Construction/<br />

operation<br />

Sydney City Centre Capa<strong>city</strong> Improvement 453<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!