Impact Environmental safeguard Responsibility Timing<br />

The potential<br />

for exceedance<br />

<strong>of</strong> the NMLs<br />

across the<br />

proposal<br />

footprint<br />

The potential<br />

for exceedance<br />

<strong>of</strong> the NMLs<br />

across the<br />

proposal<br />

footprint<br />

The potential<br />

for exceedance<br />

<strong>of</strong> the NMLs<br />

across the<br />

proposal<br />

footprint<br />

The potential<br />

for exceedance<br />

<strong>of</strong> the NMLs<br />

across the<br />

proposal<br />

footprint<br />

The potential<br />

for exceedance<br />

<strong>of</strong> the NMLs<br />

across the<br />

proposal<br />

footprint<br />

Include a specific process for<br />

documenting and resolving<br />

issues and complaints.<br />

Note: The CNVMP would be<br />

routinely updated in response to<br />

any changes in noise and<br />

vibration. Tool box talks would be<br />

used to communicate constructor<br />

obligations and responsibilities<br />

under the plan.<br />

Further investigate all feasible and<br />

reasonable safeguards and<br />

management measures for<br />

affected receivers in accordance<br />

with Road Noise Policy (DECCW,<br />

2011) and Environmental Noise<br />

Management Manual Practice<br />

Note 4 (Roads and Maritime,<br />

2001).<br />

Locate fixed plant as far from<br />

residences as possible and behind<br />

site structures.<br />

Restrict the use <strong>of</strong> reversing<br />

alarms where it is feasible<br />

notwithstanding worker and public<br />

health and safety requirements.<br />

Aim to schedule delivery times to<br />

within the recommended standard<br />

hours for construction<br />

notwithstanding the need to avoid<br />

peak periods where possible.<br />

Out <strong>of</strong> hours working would<br />

comply with the requirements <strong>of</strong><br />

quality assurance specification<br />

G36 relating to community<br />

notification requirements.<br />

Roads and<br />

Maritime<br />

Construction<br />

contractors<br />

Construction<br />

contractors<br />

Construction<br />

contractors<br />

Construction<br />

contractors<br />

Detailed<br />

design<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 228<br />

Review <strong>of</strong> Environmental Factors