24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

York Street intersection<br />

Clarence Street to York Street<br />

Clarence Street intersection<br />

Kent Street to Clarence Street<br />

Ref<br />

(refer<br />

Fig 3-1<br />

to 3-3)<br />

D<br />

Proposal description<br />

Remove parking on the southern kerb:<br />

<br />

Introduce full time ‘no stopping’<br />

restrictions (affecting existing<br />

weekday evening and weekend<br />

parking provisions)<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

Supporting work:<br />

Remove the parking ticket vending<br />

machine<br />

E<br />

<br />

Remove the kerb extension on the<br />

eastern kerb on Clarence Street<br />

immediately north <strong>of</strong> the<br />

intersection<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

Kerb/kerb ramp relocation<br />

<br />

Footpath alterations<br />

<br />

Signage relocation<br />

<br />

Traffic signal relocation<br />

<br />

Localised resurfacing<br />

<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Modify existing drainage pits Relocate<br />

the street lighting pole<br />

<br />

Relocate the water fountain<br />

<br />

Relocate the rubbish bin<br />

F<br />

Remove parking on the northern kerb:<br />

<br />

Introduce full time ‘no stopping’<br />

restrictions (affecting existing inter<br />

peak loading zones, weekday<br />

evening and weekend parking<br />

provisions)<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Remove the parking ticket vending<br />

machine<br />

G<br />

<br />

Change the line marking to<br />

improve the geometry at the<br />

intersections<br />

Type No. 1: Intersection reconfiguration<br />

and geometry modifications:<br />

<br />

Line marking alterations<br />

<br />

<br />

Minor reduction to the kerb<br />

extension on the western kerb <strong>of</strong><br />

York Street immediately south <strong>of</strong><br />

the intersection<br />

Widen the pedestrian crossing in<br />

York Street on the southern side <strong>of</strong><br />

the intersection<br />

Type No. 2: Kerb extension alterations:<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

Kerb/kerb ramp relocation<br />

Footpath alterations<br />

Signage relocation<br />

Traffic signal relocation<br />

Localised resurfacing<br />

Lane marking alterations<br />

Sydney City Centre Capa<strong>city</strong> Improvement 63<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!