Typical improvement (with<br />

example)<br />

6: Lane arrangements<br />

Kent Street between<br />

Erskine Street and King<br />

Street and (NW1)<br />

Features<br />

Lane arrangements would be<br />

altered between intersections<br />

(eg the conversion <strong>of</strong> a through<br />

lane to a through and left-turn<br />

lane).<br />

Typical construction activities associated with each stage <strong>of</strong> work (refer to<br />

section 3.3)<br />

Stage 1: Establishment works<br />

Temporary traffic management (establishment) (where required)<br />

Temporary footpath restriction/closure (establishment) (where required)<br />

Install <strong>environmental</strong> controls (refer to Chapter 7)<br />

Stage 3: Signage and traffic signal alterations and bus lane markings<br />

Signage alterations (where required)<br />

Traffic signpost alterations (where required)<br />

Stage 4: Reinstatement, refurbishment and post works<br />

Localised patching and resurfacing (where required)<br />

Lane marking alterations<br />

Supporting work<br />

Clarence Street north <strong>of</strong><br />

In certain locations supporting<br />

work would be required to<br />

install the above traffic capa<strong>city</strong><br />

improvements. Depending on<br />

the location, this would involve:<br />

<br />

Major equipment relocation<br />

(eg telephone boxes,<br />

parking ticket vending<br />

machines, post boxes)<br />

Stage 5: Site hand back<br />

Temporary traffic management (removal) (where required)<br />

Temporary footpath restriction/closure (removal) (where required)<br />

Remove <strong>environmental</strong> controls (refer to Chapter 7)<br />

Stage 1: Establishment works<br />

Major equipment relocation<br />

Tree removal and pruning<br />

Lighting pole relocation<br />

Utility modification<br />

Signage alterations<br />

Traffic signal alterations<br />

Sydney City Centre Capa<strong>city</strong> Improvement 59<br />