24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Work site Construction activities Impact summary<br />

G: Campbell Street<br />

intersection<br />

C2: College Street<br />

A: Macquarie Street<br />

intersection<br />

Install equipment to support traffic<br />

management controls and footpath<br />

restrictions<br />

Ground excavation work to relocate general<br />

signage and traffic signals plus undertake<br />

kerb and footpath alterations, drainage<br />

modifications and relocate road furniture<br />

Localised resurfacing and line marking<br />

alterations<br />

Install equipment to support traffic<br />

management controls and footpath<br />

restrictions<br />

Ground excavation work to relocate general<br />

signage and traffic signals plus undertake<br />

kerb and footpath alterations, drainage<br />

modifications and relocate road furniture<br />

Localised resurfacing and line marking<br />

alterations<br />

Regrade and resurface the road<br />

Tree removal/pruning<br />

Public transport: Secondary bus route corridor and potential<br />

requirement for diversions or experience temporary delays<br />

Local economy: Triple Ace Bar: Temporary effects on out <strong>of</strong> hours<br />

trading<br />

Public transport: Secondary bus route corridor and potential<br />

requirement for diversions or experience temporary delays<br />

Social infrastructure: St James Church, Supreme Court and Hyde<br />

Park Barracks: Temporary loss <strong>of</strong> amenity and potential minor access<br />

restrictions<br />

Movement: Entry driveway to Hyde Park (southern kerb): Long-term<br />

temporary access restriction Minor amenity impacts to enjoyment <strong>of</strong><br />

Hyde Park<br />

Movement: Temporary loss <strong>of</strong> access to six kerbside mobility parking<br />

spaces (note: these will be permanently removed under the proposal)<br />

Movement: Temporary loss <strong>of</strong> police/sheriff spaces may impact<br />

operation <strong>of</strong> court building<br />

Public transport: Primary bus route corridor and potential<br />

requirement for diversions or experience temporary delays<br />

Open space and heritage: Hyde Park: Loss <strong>of</strong> amenity and potential<br />

minor access restrictions<br />

Sydney City Centre Capa<strong>city</strong> Improvement 301<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!