24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Work site<br />

D: Wemyss Lane to<br />

Goulburn Street<br />

E: Goulburn Street<br />

intersection<br />

F: Goulburn Street to<br />

Campbell Street<br />

Traffic capa<strong>city</strong><br />

improvement<br />

3: Footpath<br />

width<br />

alterations<br />

5: Kerbside<br />

allocation<br />

modifications<br />

1: Intersection<br />

reconfiguration<br />

and geometry<br />

modifications<br />

5: Kerbside<br />

allocation<br />

modifications<br />

6: Lane<br />

arrangements<br />

Impact summary<br />

Local economy: Effects on businesses not being able to unload goods during the weekday<br />

morning, inter and afternoon peak periods<br />

Local economy: Improvements in businesses being able to unload goods during the weekday<br />

inter peak period<br />

Social infrastructure: Alteration/reduction <strong>of</strong> the western footpath immediately north <strong>of</strong> Lyons<br />

Lane and the western footpath immediately north <strong>of</strong> Commonwealth Street reducing pedestrian<br />

capa<strong>city</strong> and amenity<br />

Amenity: Loss <strong>of</strong> parking provisions during the morning and afternoon weekday peak periods<br />

affecting those that rely on use <strong>of</strong> these provisions to access the <strong>city</strong> for commuting, recreation,<br />

shopping and other uses leading to amenity changes<br />

Amenity: Removal <strong>of</strong> one tree that would have a negligible effect on the area’s amenity<br />

Amenity: Permanent loss <strong>of</strong> motorcycle parking reducing amenity and access for this user<br />

group across the week including those that rely on these provisions for commuting, recreation<br />

and other uses<br />

Movement: Creation <strong>of</strong> a ‘no stopping’ zone resulting in improvements to vehicular connectivity<br />

and movement<br />

Public transport: Retain kerbside coach and bus provisions<br />

Social infrastructure: Alteration/reduction <strong>of</strong> the pedestrian island on the northbound to<br />

westbound slip Wentworth Avenue to Goulburn Street reducing pedestrian capa<strong>city</strong> and amenity<br />

Movement: Improvements to vehicular connectivity and movement<br />

Local economy: Effects on businesses not being able to unload goods during the weekday<br />

morning and afternoon peak periods<br />

Social infrastructure: Loss <strong>of</strong> one car-sharing space reducing capa<strong>city</strong> and amenity<br />

Amenity: Loss <strong>of</strong> parking provisions during the morning, inter and afternoon weekday peak<br />

periods affecting those that rely on use <strong>of</strong> these provisions to access the <strong>city</strong> for commuting,<br />

recreation, shopping and other uses leading to amenity changes<br />

Movement: Creation <strong>of</strong> a ‘no stopping’ zone resulting in improvements to vehicular connectivity<br />

and movement<br />

Sydney City Centre Capa<strong>city</strong> Improvement 318<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!