24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Impact Environmental safeguard Responsibility Timing<br />

Driver safety<br />

across the<br />

proposal during<br />

operation<br />

<br />

<br />

<br />

Notify the public to describe<br />

the altered traffic conditions<br />

Place notices along the<br />

proposal footprint forewarning<br />

<strong>of</strong> the changes<br />

Introduce the traffic changes<br />

in stages to allow driver<br />

familiarisation.<br />

Roads and<br />

Maritime<br />

Operation<br />

6.15 Cumulative impacts<br />

Clause 228 <strong>of</strong> the EP&A Regulation requires that for the purposes <strong>of</strong> Part 5 <strong>of</strong> the<br />

EP&A Act any cumulative <strong>environmental</strong> effect <strong>of</strong> the proposal with other existing or<br />

likely future activities must be taken into account when consideration is being given<br />

to the likely impact <strong>of</strong> an activity on the environment.<br />

This section assesses the potential cumulative effects <strong>of</strong> constructing and operating<br />

the proposal in combination with other, as yet unbuilt, projects.<br />

6.15.1 Method<br />

Study area<br />

The cumulative effects study area considered the geographical location (spatial) and<br />

timing (temporal) extent <strong>of</strong> any potential impacts identified in section 6.1 to<br />

section 6.14.<br />

Method and assessment criteria<br />

The assessment:<br />

Identified the proposal’s impacts<br />

Identified committed projects that are likely to be under construction and/or<br />

operation in the <strong>city</strong> <strong>centre</strong> at the same time as the proposal, by referring to:<br />

- The NSW Department <strong>of</strong> Planning and Environment major projects<br />

assessments register<br />

- The Australian Government Department <strong>of</strong> Environment public notices<br />

and the invitation to comment register<br />

- Public agency websites that are progressing development under Part 5 <strong>of</strong><br />

the EP&A Act, with a particular focus on Transport for NSW and Roads<br />

and Maritime websites<br />

- The City <strong>of</strong> Sydney Access Strategy (Transport for NSW, 2013)<br />

Identified the potential impacts <strong>of</strong> the above projects where known<br />

Assessed if the proposal’s l impacts would combine with the impacts <strong>of</strong> these<br />

projects to create a cumulative effect<br />

Assessed if the safeguards and management measures considered in this REF<br />

would be affected sufficient to need modifying or supplementing.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 411<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!