24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project Description Location and interface with the<br />

proposal (spatial parameters)<br />

Cockle Bay –<br />

Darling<br />

Harbour<br />

Proposed renewal <strong>of</strong> marine structures in Cockle Bay<br />

including the convention berth, harbour side steps,<br />

harbour side jetty, Cockle Bay marina, and commercial<br />

berths.<br />

Darling Harbour<br />

R3: Sussex Street (100 metres<br />

west).<br />

Status (temporal<br />

parameters)<br />

No planned construction<br />

date; however it<br />

potentially could take<br />

place from July 2015.<br />

Completion date<br />

unknown.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 416<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!