24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Typical improvement (with<br />

example)<br />

Features<br />

Typical construction activities associated with each stage <strong>of</strong> work (refer to<br />

section 3.3)<br />

Stage 4: Reinstatement, refurbishment and post works<br />

Localised patching and resurfacing (where required)<br />

Lane marking alterations<br />

5: Kerbside allocation modifications<br />

Along the eastern kerb <strong>of</strong><br />

between Jamison Street<br />

and Margaret Street (R4)<br />

Kerbside allocations would be<br />

reduced, time-restricted,<br />

removed or relocated either in<br />

isolation or in combination with<br />

the proposed kerb extension<br />

alterations (refer to<br />

improvement No. 2 above) or<br />

the footpath width alterations<br />

(refer to improvement No. 3<br />

above).<br />

Stage 5: Site hand back<br />

Temporary traffic management (removal) (where required)<br />

Temporary footpath restriction/closure (removal) (where required)<br />

Remove <strong>environmental</strong> controls (refer to Chapter 7)<br />

Stage 1: Establishment works<br />

Temporary traffic management (establishment) (where required)<br />

Temporary footpath restriction/closure (establishment) (where required)<br />

Install <strong>environmental</strong> controls (refer to Chapter 7)<br />

Stage 3: Signage and traffic signal alterations and bus lane markings<br />

Signage alterations (where required)<br />

Traffic signpost alterations (where required)<br />

Stage 4: Reinstatement, refurbishment and post works<br />

Localised patching and resurfacing (where required)<br />

Lane marking alterations<br />

Stage 5: Site hand back<br />

Temporary traffic management (removal) (where required)<br />

Temporary footpath restriction/closure (removal) (where required)<br />

Remove <strong>environmental</strong> controls (refer to Chapter 7)<br />

Sydney City Centre Capa<strong>city</strong> Improvement 58<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!