No Impact Environmental safeguard Responsibility Timing<br />

23 Potential heritage and<br />

archaeological impacts –<br />

general.<br />

24 Potential impacts on<br />

heritage items, and<br />

archaeology.<br />

Develop a non-Aboriginal heritage management plan (AHMP).<br />

It would be a sub-plan <strong>of</strong> the CEMP.<br />

As a minimum, the plan would:<br />

Map locations <strong>of</strong> known and potential sites <strong>of</strong> heritage and<br />

archaeological value do identify high-risk and no-go zones<br />

Identify potential <strong>environmental</strong> risks and impacts due to the<br />

proposed work<br />

Identify appropriate safeguards and management measures<br />

to minimise potential risk<br />

Identify appropriate safeguards and management measures<br />

to avoid the risk <strong>of</strong> harm<br />

Implement appropriate safeguards and management<br />

measures to protect heritage items and potential<br />

archaeological assets<br />

Ensure compliance with the Standard Management<br />

Procedure -Unexpected Archaeological Finds, (Roads and<br />

Maritime, 2012).<br />

Investigate and prepare a report to assess the heritage and<br />

archaeological impacts in close proximity to the planned work.<br />

Focus on potential impacts on the sandstone plinth <strong>of</strong> the former<br />

palisade fence that surrounded Hyde Park (work site C2:<br />

College Street) and Busby’s Bore (work site C1: Wentworth<br />

Avenue).<br />

If a potential risk is identified consider design modifications<br />

including avoidance.<br />

Implement additional safeguards and management measures if<br />

there is a residual impact that cannot be avoided/sufficiently<br />

minimised through design. This would be undertaken in<br />

consultation with an experienced heritage practitioner to reduce<br />

potential adverse heritage impacts on significant fabric.<br />

Note: Any monitoring and recording should be undertaken in<br />

accordance with relevant approvals under the Heritage Act 1977<br />

Construction<br />

contractor<br />

Roads and<br />

Maritime<br />

Pre-construction<br />

Detailed design<br />

Sydney City Centre Capa<strong>city</strong> Improvement 442<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!