No Impact Environmental safeguard Responsibility Timing<br />

Traffic and transport<br />

7 Construction traffic impacts<br />

across the whole proposal<br />

footprint<br />

A construction traffic management plan (CTMP) would be<br />

prepared in accordance with Traffic Control at Works Sites<br />

(Roads and Maritime, 2011) and QA specification G10: Control<br />

<strong>of</strong> Traffic (Roads and Maritime, 2011) as a sub-plan <strong>of</strong> the<br />

CEMP. As a minimum, the plan would include the following<br />

controls:<br />

Minimise use <strong>of</strong> heavy vehicle on local roads<br />

Restrict deliveries to outside <strong>of</strong> peak traffic periods where<br />

possible<br />

Ensure emergency vehicle access is maintained, including<br />

consultation with emergency services<br />

Manage short-term access restrictions during construction<br />

Regulate traffic movements and minimise traffic switching<br />

during construction through implemented traffic controls<br />

Maintain continuous, safe and efficient traffic movement<br />

Identify haulage routes and minimise impacts on local routes<br />

Maintain local road and property access, including the use <strong>of</strong><br />

temporary turn-around bays<br />

Maintain pedestrian and cyclist access throughout<br />

Provide warning and advisory signage<br />

Provide for local community consultation and notification <strong>of</strong><br />

local road network and traffic impacts<br />

Identify and consider other construction works occurring in<br />

the area at the same time to minimise additive traffic conflict<br />

and congestion impacts.<br />

Note: the plan would be <strong>review</strong>ed by City <strong>of</strong> Sydney and CSTTC.<br />

Construction<br />

contractor<br />

Pre-construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 437<br />

Review <strong>of</strong> Environmental Factors