24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pitt Street to Castlereagh Street<br />

George Street to Pitt Street<br />

York Street to George Street<br />

Ref<br />

(refer<br />

Fig 3-4<br />

to 3-9)<br />

Proposal description<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

F<br />

<br />

Reduce the northern kerb footpath<br />

to improve road geometry and<br />

traffic capa<strong>city</strong>.<br />

Type No. 3: Footpath width alterations:<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

<br />

Footpath alterations<br />

<br />

Localised resurfacing<br />

<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Relocate existing drainage pit and inlet<br />

<br />

Extend existing drainage downpipes<br />

<br />

Install new drainage gutters<br />

<br />

Modify existing drainage pits<br />

<br />

Remove the three existing Simons<br />

Poplar trees along the northern<br />

footpath<br />

<br />

Relocate the phone booth<br />

G<br />

George Street intersection: No change<br />

H<br />

Alter the parking provisions on the<br />

southern kerb:<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Relocate the existing coach<br />

parking on the southern kerb to<br />

the western kerb on Pitt Street<br />

Remove a section (18-20 m) <strong>of</strong> the<br />

loading zone in Pitt Street to<br />

accommodate coach parking<br />

relocated from Market Street<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

<br />

Introduce full time ‘no stopping’<br />

restrictions on southern kerb <strong>of</strong><br />

Market Street (affecting authorised<br />

parking and taxi provisions).<br />

Alter the parking provisions on the<br />

northern kerb:<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Increase the length <strong>of</strong> ‘no parking’<br />

adjacent to Swissotel<br />

Create a morning peak period<br />

loading zone from Monday to<br />

Saturday and taxi zone for the rest<br />

<strong>of</strong> the day (affecting motorcycle<br />

parking).<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

I<br />

Pitt Street intersection: No change<br />

J<br />

Alter bus zone, loading zone and taxi<br />

rank provisions on the southern kerb:<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

Introduce ‘no stopping’ restrictions<br />

during weekday morning, inter and<br />

afternoon peak periods and create<br />

a taxi zone at other times<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

<br />

Remove loading zones that<br />

currently operate during the<br />

weekday inter peak period and the<br />

taxi zone that currently operates<br />

during the weekday inter and<br />

afternoon peak periods.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 74<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!