24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Loading zones<br />

Mobility parking<br />

spaces<br />

Motorcycle zones<br />

On-street parking<br />

Mail Zone spaces<br />

Bus zones<br />

Taxi Zone spaces<br />

There would be a greater chance <strong>of</strong> restrictions affecting the kerbside in locations<br />

where more major work would take place (refer to the grey shaded activities in<br />

Table 3-3 to Table 3-7). This is denoted by the potential impact duration shown<br />

in Table 6-7.<br />

Table 6-7<br />

Temporary kerbside use restrictions during construction – summary<br />

Precinct 1: north west<br />

NW1: Kent Street<br />

Short-term temporary traffic management<br />

controls and temporary footpath<br />

restriction/closure<br />

NW2: King Street<br />

Medium-to-long-term temporary traffic<br />

management controls and temporary<br />

footpath restriction/closure and the<br />

requirement to regrade and resurface the<br />

road<br />

Precinct 2: retail<br />

R1: Park Street<br />

Long-term temporary traffic management<br />

controls and temporary footpath<br />

restriction/closure associated with a work site<br />

R2: Market Street<br />

*Long-term temporary traffic management<br />

controls and temporary footpath<br />

restriction/closure associated with a major<br />

work site<br />

R3: Sussex Street<br />

Short-term temporary traffic management<br />

controls and temporary footpath<br />

restriction/closure<br />

R4: Clarence Street<br />

*Long-term temporary traffic management<br />

controls and temporary footpath<br />

restriction/closure associated with a major<br />

work site<br />

R5: York Street<br />

*Long-term temporary traffic management<br />

controls and temporary footpath<br />

restriction/closure associated with a major<br />

work site<br />

3 - 14 10 - - 7<br />

31 - - 29 2 1 4<br />

4 - - 4 - - -<br />

5 - 9 9 3 1 -<br />

8 - 7 37 3 1 20<br />

78 4 3 93 2 5 -<br />

10 1 - 10 - 1 4<br />

Sydney City Centre Capa<strong>city</strong> Improvement 185<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!