24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Future land uses and development precincts<br />

The proposal would be constructed at the same time as Barangaroo, Wynyard Walk<br />

(precinct 1: north west), Circular Quay (precinct 1: north west and precinct 2: retail),<br />

Darling Harbour (precinct 2: retail). CSELR early works (precinct 1: north west,<br />

precinct 2: retail) and the APDG development (precinct 2: retail), the impacts <strong>of</strong> which<br />

are considered further in section 6-15.<br />

The proposal would not inhibit, conflict with, or affect land use development within<br />

these precincts. Its only impact would be indirect, relating to the potential for shortterm<br />

minor traffic delays through each work site during construction (refer to<br />

section 6.1.3). The work would be staged and programmed to reduce travel delays<br />

during times <strong>of</strong> heaviest traffic demand, which would include any required access to<br />

these development precincts (eg during critical delivery times).<br />

Property impacts during construction<br />

Property acquisition<br />

No property acquisition, adjustments or leasing would be required as part <strong>of</strong> the<br />

proposal (refer to section 3.6). This includes the likely construction<br />

compounds/laydown areas which are already established (refer to section 3.4.2).<br />

Roadside property<br />

Adjacent roadside property would not be affected during construction. This includes<br />

any direct awning impacts (eg removal or partial removal). However, amenity values<br />

and access would be affected in a number <strong>of</strong> locations as described in section 6.1.3<br />

and section 6.4.3 respectively.<br />

Road reserve property<br />

Access to existing road reserve property would be restricted by the temporarily<br />

removing or restricting access to certain sections <strong>of</strong> road and footpath. This would<br />

result in the temporary loss <strong>of</strong>:<br />

- Utilities<br />

- Advertising boards<br />

- Street lighting<br />

- Awnings and awning signage<br />

- Advertisement signs<br />

- Bollards and barriers<br />

- Trees<br />

- Benches and seating<br />

- Telephone box<br />

- Bus shelters/stops<br />

- Rubbish bins<br />

- Bicycle racks<br />

- Mail boxes.<br />

The locations where utilities would be adjusted are described in Table 3-14. Roads<br />

and Maritime would work with utility suppliers, businesses and City <strong>of</strong> Sydney to<br />

identify any conflicts in maintenance or upgrade schedules (refer section 6.5.4).<br />

Emergency access for maintaining these assets would be managed in accordance<br />

with the provisions set out in section 6.14.4. Furthermore, all service providers would<br />

be contacted before construction to determine their emergency access requirements,<br />

with provisions included in the CEMP (refer section 6.5.4). Consequently, the<br />

associated impact is assessed as negligible.<br />

The temporary kerbside and footpath restrictions would also affect up 15 bus stops<br />

as described in section 6.1.3 with the associated socioeconomic impacts discussed<br />

in section 6.4.3.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 330<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!