Consequently, the proposal is to work for extended periods including out <strong>of</strong> hours<br />

working (refer to section 3.3). This would allow the construction program to be staged<br />

to reduce travel delays during times <strong>of</strong> heaviest traffic demand (ie peak periods) and<br />

to limit the overall impact on the performance <strong>of</strong> the <strong>city</strong> <strong>centre</strong> road network during<br />

construction. Notwithstanding this approach, there would still be a range <strong>of</strong> potential<br />

traffic, transport and access impacts experienced during construction as described<br />

below.<br />

Transport and road infrastructure (construction impacts)<br />

Existing road infrastructure<br />

The proposal would temporarily alter the configuration and layout <strong>of</strong> the existing road<br />

network in order to construct each <strong>of</strong> the proposed improvements. The changes<br />

would depend on the nature and scale <strong>of</strong> the proposed work, with the more major<br />

work sites (refer to grey shaded cells in Table 3-3 to Table 3-7) requiring more<br />

extensive changes potentially over the medium-term (up to three months) and longterm<br />

(over three months). The consequential traffic, transport and access impact <strong>of</strong><br />

this is described below.<br />

Pedestrian and cycleway infrastructure<br />

Footpath and cycleway restrictions would be implemented during construction. This<br />

would temporarily reduce pedestrian and cycleway capa<strong>city</strong> and accessibility in the<br />

<strong>city</strong>. Table 6-5 describes the required temporary footpath and cycleway restrictions<br />

(ie reduced footpath widths) that would be implemented at the major work site<br />

locations. Other more minor temporary restrictions may be required at all the other<br />

locations across the proposal footprint however they would be short-term lasting<br />

typically no more than a few days.<br />

Table 6-5<br />

Temporary footpath and cycleway restrictions during construction<br />

Section<br />

Precinct 1: north west<br />

NW1: Kent Street<br />

C: Erskine Street intersection<br />

6: Lane arrangements<br />

NW2: King Street<br />

A: Sussex Street intersection<br />

1: Intersection reconfiguration and<br />

geometry modifications<br />

South east kerb on the intersection<br />

E: Clarence Street intersection<br />

2: Kerb extension alterations<br />

Eastern kerb extension on Clarence<br />

Street immediately north <strong>of</strong> the<br />

intersection<br />

Temporary footpath/cycleway restriction<br />

Potential short-term reduced access <strong>of</strong> the<br />

cycleway across the intersection due to traffic<br />

management controls<br />

Medium-term impact due to temporary<br />

footpath restriction/closure<br />

Potential short-term reduced access <strong>of</strong> the<br />

cycleway<br />

Long-term impact due to temporary footpath<br />

restriction/closure<br />

Sydney City Centre Capa<strong>city</strong> Improvement 177<br />

Review <strong>of</strong> Environmental Factors