24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No Impact Environmental safeguard Responsibility Timing<br />

Land use and property<br />

33 Road reserve infrastructure<br />

maintenance during<br />

construction across the<br />

whole proposal footprint.<br />

Notify residents and businesses prior to any utility service<br />

interruption due to required adjustments in Table 3-11.<br />

Construction<br />

contractor<br />

Pre-construction<br />

Road reserve infrastructure<br />

maintenance during<br />

construction across the<br />

whole proposal footprint.<br />

Prepare a utility management plan in parallel with an<br />

<strong>environmental</strong> work method statement (refer to Chapter 7). The<br />

plan would form part <strong>of</strong> the CEMP and as a minimum would<br />

include:<br />

<br />

Utility company consultation<br />

Roads and<br />

Maritime<br />

Construction<br />

contractor<br />

Pre-construction/<br />

Construction<br />

<br />

Identify maintenance and Emergency access requirements.<br />

Identify construction staging and programming conflicts.<br />

34 Emergency road side<br />

access during construction<br />

across the whole proposal<br />

footprint.<br />

Contact all service providers to determine their emergency<br />

access requirements. Include these provisions in the CEMP.<br />

Construction<br />

contractor<br />

Pre-construction/<br />

Construction<br />

35 Loss <strong>of</strong> access to kerbside<br />

public amenities during<br />

construction.<br />

Provide and display signage displaying the location to the<br />

nearest alternative amenity to the affected work site.<br />

Construction<br />

contractor<br />

Pre-construction/<br />

Construction<br />

Landscape character and visual impact<br />

36 Management <strong>of</strong> the<br />

construction works to<br />

minimise their visual<br />

impacts and localised effect<br />

on streetscape character.<br />

<br />

<br />

<br />

Erect screening and hoardings around each major traffic<br />

capa<strong>city</strong> improvement scheme where viable<br />

Implement a maintenance schedule to ensure the work sites<br />

remain clear and tidy, including the key entry and exit points<br />

For minor work sites consider alternative screen methods<br />

(eg low bollards) to reduce the visual impact <strong>of</strong> the work site.<br />

Construction<br />

contractor<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 445<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!