No Impact Environmental safeguard Responsibility Timing<br />

3 Landscape and visual<br />

impact.<br />

4 Potential ancillary facility<br />

impacts due to changes<br />

during the detailed design<br />

or inadequacy <strong>of</strong> the<br />

construction<br />

compounds/laydown areas<br />

to service the proposal.<br />

5 Ensure the detailed design<br />

responds to the proposal’s<br />

urban design principles and<br />

themes.<br />

6 Ensure all stakeholders,<br />

government agencies,<br />

special interest groups,<br />

advocacy groups and<br />

interested parties are<br />

consulted on the matters<br />

described in this REF.<br />

<br />

<br />

<br />

A map indicating the locations <strong>of</strong> sensitive locations (such as<br />

threatened species or heritage items), the likely potential<br />

<strong>environmental</strong> impacts and work areas<br />

Identification <strong>of</strong> works areas and exclusions areas<br />

Details <strong>of</strong> a process for progressive <strong>review</strong>, for example<br />

monitoring processes and mitigations to eliminate/reduce<br />

<strong>environmental</strong> risks/impacts.<br />

Finalise the proposal’s landscape and urban design strategy<br />

during detailed design in consideration <strong>of</strong> design principles and<br />

objectives as described in the REF's urban design principles.<br />

Consult Environment Branch <strong>of</strong> Roads and Maritime (Sydney<br />

Region) once ancillary facility details are confirmed to determine<br />

if any additional <strong>environmental</strong> assessment is required.<br />

Adopt the urban design principles described in section 3.2.4<br />

when developing the detailed design.<br />

Implement ongoing consultation in line with the provisions<br />

described in section 5.6 <strong>of</strong> this REF and with reference to the<br />

other safeguards described in Chapter 6.<br />

Roads and<br />

Maritime<br />

Roads and<br />

Maritime<br />

Roads and<br />

Maritime<br />

Roads and<br />

Maritime/<br />

construction<br />

contractor<br />

Detailed Design<br />

Detailed design<br />

Detailed design<br />

Detailed design/<br />

pre-construction/<br />

construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 436<br />

Review <strong>of</strong> Environmental Factors