24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Location<br />

Driveway type and location<br />

Construction activity and likely duration <strong>of</strong> access restriction<br />

(refer to Table 3-3 to Table 3-7)<br />

D: Prince Albert<br />

Road to Park<br />

Street<br />

Driveway entry to St Mary’s Cathedral (eastern kerb) Medium-term temporary restriction in access due to traffic<br />

management controls, temporary footpath<br />

restrictions/closure to implement adjacent kerbside<br />

allocation modifications on both kerbs.<br />

F: Park Street to<br />

Oxford Street<br />

<br />

<br />

Australian Museum driveway access (eastern kerb)<br />

Pullman Hotel driveway (eastern kerb)<br />

Medium-term temporary restriction in access due to traffic<br />

management controls, temporary footpath<br />

restrictions/closure to implement adjacent lane arrangement<br />

adjustments and adjacent kerbside allocation modifications<br />

on the eastern kerb.<br />

Precinct 5: financial<br />

F1: Macquarie Street<br />

B: Bent Street to<br />

Bridge Street<br />

Driveway entry to private car park (western kerb) Long-term temporary restriction in access due to traffic<br />

management controls, temporary footpath<br />

restrictions/closure to implement adjacent kerb extension<br />

alteration and kerbside allocation modification on the<br />

western kerb.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 193<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!