Reasonable and feasible plant and equipment<br />

Stage 5: Site hand back<br />

For all traffic capa<strong>city</strong><br />

improvements and<br />

supporting work (refer<br />

to Table 3-10)<br />

· Bobcat<br />

· Generator<br />

· Hand tools<br />

· Tipper truck<br />

· Trucks<br />

3.3.6 Earthworks<br />

A small quantity <strong>of</strong> excavated material would be generated as result <strong>of</strong> kerb, median<br />

and footpath works; road furniture works; drainage works; utility adjustments; and<br />

lighting pole relocation works. These materials would not be backfilled. Instead, they<br />

would be taken <strong>of</strong>fsite for disposal. Imported clean structural and general fill would be<br />

used to reinstate each work site. The exact materials balance (eg the volume <strong>of</strong><br />

excavated materials versus the required fill materials) would be determined during<br />

the proposal’s detailed design.<br />

3.3.7 Resources, materials and sourcing<br />

The type and quantities <strong>of</strong> resources and materials needed to construct the proposal<br />

would be confirmed during the detailed design. Provisional key material requirements<br />

are as follows:<br />

· Traffic management:<br />

- Block and mesh fencing<br />

- Temporary traffic signage<br />

- Traffic barriers.<br />

· Kerb, median and pedestrian island<br />

works:<br />

- Paving stones<br />

- Trachyte kerbstones<br />

- Kerb ramps<br />

- Road base materials<br />

- Concrete<br />

- Asphalt and bitumen.<br />

· Footpath works:<br />

- Paving stones<br />

- Trachyte kerbstones<br />

- Concrete<br />

- Asphalt and bitumen.<br />

· Signage and traffic signals:<br />

- Metal poles<br />

- Sheet metal<br />

- Wires and electrical equipment<br />

- Traffic lights<br />

- Paint<br />

- Sand<br />

- Cement<br />

- Concrete<br />

- Asphalt and bitumen.<br />

· Resurfacing:<br />

- Sand<br />

- Cement<br />

- Concrete<br />

- Structural fill<br />

- General fill<br />

- Road base materials<br />

- Road sub base materials<br />

- Gravel and binder<br />

- (Coloured) asphalt and<br />

bitumen.<br />

· Line markings:<br />

- Paint.<br />

· Utilities and drainage works:<br />

- Sand<br />

- Cement<br />

- Concrete<br />

- Structural fill<br />

- General fill<br />

- Electrical cable<br />

- Steel and plastic pipe<br />

- Drainage inlets, pipes and<br />

gutters.<br />

· Other works:<br />

- Sand<br />

- Cement<br />

- Concrete<br />

- General fill<br />

- Lighting poles and street lamps<br />

- Equipment (power consoles,<br />

electrical circuit boards).<br />

· General construction equipment:<br />

- Diesel, petrol, fuel and oil<br />

- Water<br />

- Lubricating oil<br />

- Paper, cardboard, metal.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 135<br />

Review <strong>of</strong> Environmental Factors