12.02.2015 Views

Tsunami - Beckman Institute Laser Resource Center

Tsunami - Beckman Institute Laser Resource Center

Tsunami - Beckman Institute Laser Resource Center

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I 1 1 ill : I I I iil 1<br />

Operation<br />

-.<br />

I<br />

Operating with Lok-to-Clock"<br />

Refer to chapter 8 for installation and operating instructions for the<br />

optional Lok-to-Clock system.<br />

System Shut-down<br />

1. Turn off the pump laser according to its user's manual.<br />

2. Turn off the chiller.<br />

To prevent condensation on the surface of the rod, do not run the<br />

chiller when the laser is off.<br />

3. Turn off the nitrogen supply at the tank, then close the regulator valve<br />

on the Model 39 10 purge unit.<br />

Do not turn off the Model 3955 or the optional Model 3930 if you plan on<br />

using the laser within the next week or so. The Model 3930 takes about 2<br />

hours to warm up properly for stable 80 MHz operation.<br />

This completes the system shut-down procedure.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!