Tsunami - Beckman Institute Laser Resource Center
Tsunami - Beckman Institute Laser Resource Center
Tsunami - Beckman Institute Laser Resource Center
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Tsunami</strong><br />
Chapter 8: Lok-to-Clock Electronics .......................... 8.1<br />
Functional Overview ................................................. 8-1<br />
System Controls .................................................... 8-2<br />
Front Panel ...................................................... 8-2<br />
Rear Panel ...................................................... 8-3<br />
Installing the Model 3930 ............................................. 8-7<br />
Operation Notes .................................................... 8-9<br />
Start-up ......................................................... 8-9<br />
Shut Down ...................................................... 8-9<br />
Typicalset-ups ..................................................... 8-10<br />
Example 1: Synchronizing Pulses from Two LTC <strong>Tsunami</strong> <strong>Laser</strong>s ....... 8-10<br />
Example 2: Synchronizing Pulses from a<br />
mode-locked laser with a LTC <strong>Tsunami</strong> ............................ 8-12<br />
Operating a Model 3950Dl3960D Without the Model 3930 ................ 8-15<br />
Lok-to-Clock Specifications ......................................... 8-17<br />
Chapter 9: Maintenance ..................................... 9.1<br />
Notes on the Cleaning of <strong>Laser</strong> Optics ................................. 9-1<br />
Equipment Required: ............................................. 9-2<br />
Standard Cleaning Procedures ..................................... 9-2<br />
General Procedures for Cleaning Optics ............................ 9-3<br />
Removing and Cleaning <strong>Tsunami</strong> Optics ............................... 9-5<br />
Brewster Windows ............................................... 9-6<br />
Prisms (fs Configuration) .......................................... 9-7<br />
Birefringent Filter (ps configuration) ................................. 9-7<br />
Pump Mirrors PI and P2 ........................................... 9-9<br />
Focus Mirror M3 and Output Coupler MI0 ........................... 9-9<br />
High Reflector MI, Focus Mirror MPJ<br />
Fold Mirrors M4 and Ms. and Prism Mirrors M6- M9 ................... 9-10<br />
GTI (ps configuration) ............................................. 9-10<br />
A10 Modulator (AOM) ............................................. 9-11<br />
....................................................<br />
..................................................<br />
Beam Splitter 9-12<br />
Routing Mirrors 9-12<br />
Replacing Filters in the Model 3910 Purge Unit .......................... 9-13<br />
viii