12.02.2015 Views

Tsunami - Beckman Institute Laser Resource Center

Tsunami - Beckman Institute Laser Resource Center

Tsunami - Beckman Institute Laser Resource Center

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installation<br />

- Installing the Chiller<br />

Detailed information on installing and starting the chiller can be found in<br />

the manual supplied with the chiller.<br />

1. Place the chiller on the floor close enough to the <strong>Tsunami</strong> laser head<br />

so the 3.5 m long hoses will reach from the chiller connectors on the<br />

back of the unit to the <strong>Tsunami</strong> front bezel connectors.<br />

WARNING<br />

Do not place the chiller above the laser. Should the unit not be installed<br />

properly and a leak develop, dripping water may damage one or both<br />

lasers.<br />

2. Unscrew the knurled nuts holding the large barbed hose fittings to the<br />

back of the chiller and remove the barbed fittings.<br />

3. Find the two hoses in the accessory kit and locate the ends without<br />

fittings. Slide one of the knurled nuts just removed over each hose<br />

end with the threads facing the end of the hose.<br />

One end of each hose has a quick-disconnect fitting already attached.<br />

4. Find the two small, barbed hose fittings in the accessory kit and push<br />

them into the ends of the two hoses.<br />

It may be a tight fit. The polyurethane hose can be stretched either<br />

using long-nosed pliers or by warming the ends a little with a flameless<br />

heater. Note: overheating the hose will damage it and can result<br />

in leaks later.<br />

5. Screw both hoses onto the chiller and tighten.<br />

The hose connections are not polarized. Finger tight is enough: do not<br />

overtighten.<br />

6. Push the quick-disconnect fitting on the other hose end into either of<br />

the two water fittings on the <strong>Tsunami</strong> input bezel. When it seats, it<br />

will fasten with a click (refer to Figure 4-3).<br />

7. Turn on the chiller and verify water is flowing.<br />

Refer to the chiller manual for instructions.<br />

8. Inspect for leaks at the hose connections just made, and also inside<br />

the laser head where the polyurethane hoses attach to the front bezel<br />

and to the rod holder.<br />

9. Set the chiller temperature for 18 " C (64 O F).<br />

This completes the installation of the chiller.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!