12.02.2015 Views

Tsunami - Beckman Institute Laser Resource Center

Tsunami - Beckman Institute Laser Resource Center

Tsunami - Beckman Institute Laser Resource Center

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installation<br />

3. Connect the purge line from the Model 39 10 purge unit to the<br />

<strong>Tsunami</strong> laser head.<br />

Use the 3.5 m PTFE purge line provided to connect the Model 3910 to<br />

the laser head. It comes with a Clip-LokTM connector on one end and<br />

a quick-disconnect connector on the other. The purge line is attached<br />

by pressing the hose connectors onto their mating connectors until<br />

they snap in place.<br />

a. Attach the Clip-LokTM connector to the output of the Model 3910.<br />

b. Attach the quick-disconnect connector to the purge input on the<br />

<strong>Tsunami</strong> laser head input bezel.<br />

WA RNlNG<br />

Do not connect the Model 3910 to a boil-off tank or other non-lab-grade<br />

nitrogen gas source, nor to any source with a pressure greater than 67<br />

kPa (10 psi) or damage to the filters will result.<br />

4. Connect the gas supply line from the Model 3910 purge unit to the<br />

nitrogen supply. Make sure you use dry, oil-free, Electronic Grade 5<br />

(or better) nitrogen (99.999% pure) to prevent contamination of the<br />

Model 3910 or your laser optics.<br />

Use the 2 m, in. i.d. PTFE gas supply line provided to connect the<br />

Model 3910 to the nitrogen supply. It comes with a Clip-LokTM connector<br />

on both ends.<br />

a. Attach one end of the gas supply line to the INPUT FROM GAS<br />

CYLINDER connector on the Model 39 10.<br />

b. Attach the other end of the gas supply line to your nitrogen supply.<br />

If your nitrogen supply does not accept a Clip-LokTM connector,<br />

cut off the existing connector and install your own. A Clip-LokTM<br />

connector for in. i.d. PTFE tubing is also included in the accessory<br />

kit.<br />

To attach barbed connectors to PTFE tubing, heat the tubing with<br />

a flameless heat source (heat gun), then quickly slide the tubing<br />

onto the barbed fitting while the tubing is still warm. Do not<br />

move the connection until it has cooled. Install the line and check<br />

for leaks.<br />

This completes the installation of the Model 3910 purge unit.<br />

Clip-Lokm is a registered trademark of Anarak, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!