<strong>Tsunami</strong><br />

Setting up the Routing Mirrors<br />

Use the two routing mirrors provided to route the pump beam to the<br />

<strong>Tsunami</strong> laser as shown in Figure 5-1 and Figure 5-2, then install the<br />

dust tubes as shown in Figure 5-2.<br />

1. Loosen the height adjustment setscrew on each routing mirror assembly<br />

and slide the mirror body from the base mount.<br />

2. Find the two table mounting holes that align the mirrors with the two<br />

lasers and, using the single captive screw in the base of each mirror<br />

assembly, fasten the bases to the table using these holes.<br />

One hole should be in the row of holes on which the BearnLok laser<br />

output window was centered, the other in the row on which the<br />

<strong>Tsunami</strong> input window was centered. The holes should be about 20<br />

cm from their respective windows and must be in the same row with<br />

each other.<br />

3. Slide the mirror body back into the base mount, leaving the setscrew<br />

loose.<br />

r<br />

Slide this dust tube over the BeamLok<br />

pump laser output snout.<br />

Insert this dust tube into the <strong>Tsunami</strong><br />

laser input bezel.<br />

7.62 cm (3 in.) Long<br />

14 cm (5.5 in.) Long 15.25 cm (6 in.) Long<br />

15.25 cm (6 in.) Long 7.65 cm (3 in.) Long<br />

15.25 cm (6 in.) Long<br />

cover to clean mirror.<br />

Setscrew to lock<br />

height adjustment.<br />

Mirror Base Mount<br />

Table Mounting Screw (Inside Base)<br />

Figure 5-2: Routing Mirror Setup<br />

5-4