12.07.2015 Views

Chefs de Mission Dossier

Chefs de Mission Dossier

Chefs de Mission Dossier

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

When leaving the Welcome Centre, transport will be provi<strong>de</strong>d to transfer athletes andNPC team officials and accompanying luggage to their allocated accommodation.4.2.3 Accommodation in the Paralympic VillageExample – apartment layoutExample – townhouse layoutAthletes and NPC team officials will be accommodated in newly constructedpermanent buildings, ranging in height from seven to 13 levels. However, in or<strong>de</strong>r tominimise the use of lifts, NPCs will be accommodated on levels one to five (includingthe ground floor). The buildings contain a combination of apartments (for four, six oreight beds) and self-contained townhouses.All apartments will have social spaces and a ratio of bathrooms to resi<strong>de</strong>nts which willmeet or exceed IPC Paralympic Village gui<strong>de</strong>lines. All bedrooms will be furnished an<strong>de</strong>quipped in accordance with IPC gui<strong>de</strong>lines. With the exception of the tiledbathrooms, all flooring will be laminated wood. Corridors within the resi<strong>de</strong>ntial blockswill be carpeted.All social spaces will have soft furnishings, a coffee table, a television with Paralympicfeed and free internet access.London 2012 – NPC <strong>Chefs</strong> <strong>de</strong> <strong>Mission</strong> <strong>Dossier</strong>81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!