14.12.2012 Views

2005 - 2006 - Pinsent Masons Water Yearbook 2012

2005 - 2006 - Pinsent Masons Water Yearbook 2012

2005 - 2006 - Pinsent Masons Water Yearbook 2012

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SENEGAL PART 2: COUNTRY ANALYSIS<br />

Groundwater<br />

Annual availability (1998) 7.60km³<br />

Per capita 844m 3<br />

Annual withdrawal (1985) 0km³<br />

Domestic (1987) 25.0%<br />

Industrial (1987) 0.0%<br />

Agriculture (1987) 75.0%<br />

The contract in reality<br />

Since 1999, it has become evident that the contract has been providing material benefits, even within<br />

its financial and operational constraints. <strong>Water</strong> delivery has increased from 96.3 million m 3 in 1997 to<br />

114.6 million m 3 in 2002, while revenues rose by 47% between 1996 and 2001 at a time when tariffs<br />

rose by 20%. There has been an increase in the number of clients from 241,671 in 1996 to 327,501 in<br />

2001. In the Dakar region (75% of the total service area), the number of private water connections<br />

increased from 135,414 in 1995 to 216,000 in 2003. Tariff rises have been kept at below 3% per<br />

annum with a low tariff for the first 20m 3 per month used, a cross subsidy system is in operation. Low<br />

income households also receive free connections and this meant that 85% of new connections in 2003<br />

were to low income households. Average water usage in Dakar is 69L per capita per day.<br />

Over the same period, the number of public standpipes in Dakar rose by 5 percent, from 940 in 1995<br />

to 1,424 in 2002. Coverage figures for the Dakar region show that the proportion of the population<br />

served increased from 80.3% (1.63 million) in 1995 to 89.5% as of the end of 2002 (2.25 million<br />

people). Leakage remediation has performed poorly because distribution losses turned out to be<br />

higher than had been assumed at the outset and indeed both the original and revised technical<br />

efficiency targets will not be met, which has impinged upon SDE’s returns, but not to an extent that<br />

has jeopardised the contract to date.<br />

MAJOR CITIES<br />

City 2000 2015 Status<br />

Dakar 2,078,000 3,481,000 <strong>Water</strong> services leased to SDE<br />

Private sector contracts awarded (Please see the relevant company entry for details)<br />

Location Contract Company<br />

Dakar/urban 10 year lease contract SDE<br />

Private sector company operations (Please see the relevant company entry for details)<br />

Company Parent company (country)<br />

Population served<br />

<strong>Water</strong> Sewerage Total<br />

SDE SAUR/Bouygues (France) 3,800,000 0 3,800,000<br />

Source:<br />

Brocklehurst, C. & Janssens, J. (2004) Innovative Contracts, Sound Relationships: Urban <strong>Water</strong> Sector Reform in Senegal.<br />

WSSSB Discussion Paper Series, 1. World Bank, Washington DC, USA.<br />

177 <strong>Pinsent</strong> <strong>Masons</strong> <strong>Water</strong> <strong>Yearbook</strong> <strong>2005</strong> – <strong>2006</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!